1. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Mahendragarh Division (Package-3 consisting Kanina and Buchawas S/Divns) under Narnaul Circle which inter-alia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Re-conductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs . Implementation of Loss Reduction Works (under RDS Scheme) in Mahendragarh Division (Package-3 consisting of Kanina and Buchawas S/Divns) under Narnaul Circle
|
Value :
15.43 Cr
*
|
154.31 Mn
*
|
Due Date :
18 Days to go
|
14/05/2024
|
TID :68766907
Haryana
|
|
|
2. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Mahendragarh Division (Package-2 consisting S/U Mahendragarh S/Divn) under Narnaul Circle which interalia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Re-conductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs. Implementation of Loss Reduction Works (under RDS Scheme) in Mahendragarh Division (Package-2 consisting of S/U Mahendragarh S/Divn) under Narnaul Circle
|
Value :
14.51 Cr
*
|
145.10 Mn
*
|
Due Date :
18 Days to go
|
14/05/2024
|
TID :68766941
Haryana
|
|
|
|
4. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Mahendragarh Division (Package-1 consisting City Mahendragarh S/Divn) under Narnaul Circle which interalia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Re-conductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs . Implementation of Loss Reduction Works (under RDS Scheme) in Mahendragarh Division (Package-1 consisting of City Mahendragarh S/Divn) under Narnaul Circle
|
Value :
14.06 Cr
*
|
140.62 Mn
*
|
Due Date :
18 Days to go
|
14/05/2024
|
TID :68766944
Haryana
|
|
|
|
6. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Narnaul Division (Package-2 consisting Ateli and Sihma S/Divns) under Narnaul Circle which interalia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Re-conductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs . Implementation of Loss Reduction Works (under RDS Scheme) in Narnaul Division (Package-2 consisting of Ateli and Sihma S/Divns) under Narnaul Circle
|
Value :
8.96 Cr
*
|
89.64 Mn
*
|
Due Date :
18 Days to go
|
14/05/2024
|
TID :68767884
Haryana
|
|
|
|
|
|