|
2. Sector : Railways Transport Services
Engineering, Procurement and Construction (EPC) for "Construction of double line track (3rd & 4th line) formation including earth work, blanketing, minor bridges, RUB, major bridges, Important bridges, RFO works, Track works, Station building, electrification works, TRD works (2x25 KV) and other miscellaneous works for 32.5T Indian Railway Standard Loading in Gaya detour section (in between DFCC CH 183.680 (IR CH434.426) (Near Koderma Detour End) to DFCC CH225.300 (Near New Kastha) in DHN and DDU Division of East Central Railway".
|
Value :
INR 1011.75 Cr
*
|
INR 10.11 Bn
*
|
Due Date :
17 Days to go
|
25/06/2024
|
TID :71588917
Multi State
|
|
|
|
4. Sector : Railways Transport Services
Earthwork in cutting and filling, blanketing,construction of minor bridges, major bridges, RUB, ROB, retaining wall, Level crossing, side drain, catch water drain, P. Way work and other ancillary works in between Kalipahari to upto Asansol Divisin including yard from IR Ch. 205.400 Km to 260.2 Km in connection with construction of multi tracking Railway BG line.
|
Value :
INR 947.57 Cr
*
|
INR 9.47 Bn
*
|
Due Date :
34 Days to go
|
12/07/2024
|
TID :72464648
West Bengal
|
|
|
5. Sector : Railways Transport Services
Earthwork in cutting and filling, blanketing, construction of minor bridges, major bridges, RUB, ROB, retaining wall, Level crossing, side drain, catch water drain, P. Way work and other ancillary works in between Kalipahari to Jurisdiction of Asansol Division including yard from IR Ch. 205.000 Km to 260.2 Km in connection with construction of multi tracking Railway BG line.
|
Value :
INR 947.57 Cr
*
|
INR 9.47 Bn
*
|
Due Date :
34 Days to go
|
12/07/2024
|
TID :72464650
Multi State
|
|
|
6. Sector : Railways Transport Services
Construction of Earth work, Major Bridges, Minor Bridges, Road Over Bridges, Road Under Bridges, Limited Height Subways/Pedestrian Crossing, Retaining Wall, Drains, Track Laying and Civil Works including Station Buildings, Service Buildings, Platforms, Residential Quarters, Station Machinery, Compound Wall and Fencing along the alignment from Solapur (Ch (-) 1086) to Tuljapur (Ch 52500) except Ch. 45760 to Ch.48660 (i.e., except Tunnel Portion) in connection with New Line section under Solapur Division of Central Railway (the "Project").
|
Value :
INR 942.03 Cr
*
|
INR 9.42 Bn
*
|
Due Date :
59 Days to go
|
06/08/2024
|
TID :72138138
Maharashtra
|
|
|
|
|
|
|