2. Sector : Power Plant
Supply of Hrts for Ww Screen Tube, Hrts for Ltsh Tube, Hrts for Bp Screen Tube, Hrts for Economiser Tube, Fin for Water Wall, Clips, Ss Rod, Outer Tube Shield, Inner Tube Shield, Sh Rh Steam Cooled Spacer Tube, Fin for Scw Size, Cassette Baffle, Hrts for Bp Screen Tube Bend, Hrs for Aph Main Bracing, Hrts for Ww Screen Tube, Hrts for Ltsh Inlet Header, Hrts for Ltsh Inlet Header Offset Bend, Cassette Baffle, L-plate - Tube Shield Other General Spares for Overhauling Qty 15450
|
Value :
INR 55.27 Lac
*
|
INR 5.52 Mn
*
|
Due Date :
22 Days to go
|
29/06/2024
|
TID :72517572
West Bengal
|
|
|
|
4. Sector : Power Plant
Work of painting of HT/LT panels, feeders, DBs installed at 210MW Plant, CSTPS. Procurement of complete set of seals for Jr SHIM 2000 (72. PA) for air pre heaters. Supply of Tyres and Tybes for various vehicles. Various work of CCW/ACW hot water return header pipe line at Cooling Tower 6A & 6B during COH. (Refloated) / Procurement of spares for HP Bypass Salve type ARS 140 A, Spray valve type E 45 S along with its actuator spares of type ASM 250-10 for CON of Unit-9. Work of Repairing / Servicing of Flow control valves of Cooling Tower 6A & 651 during Unit- 6 overhaul period at CSTPS. Strengthening, Conservation & Nurturing of Biodivetsity Orchard at Grit Filter of CSTPS. Work contract of spraying Pater along the roads and fitting era)/ ear from sideways of roads at remote silo & area installed at Unit-B89. Work of replacement, repairing of ESP type PAA-9X45H-2X90150-2 During annual overhaul of Unit-8 at Set Handling Plant. Strengthening of Economizer, APH 8 Duct Hoppers during Annual Overhaul of Unit-8 at CSTPS. Work of servicing of bottom ash & coarse ash evacuation systems during annual overhaul of Unit-8 Mash handling plant. Annual Contract for Transportation of HT motors for Una-38, 4 for CSTPS. Work of NDCT Pond, Dud, Channel, Forebay & Sump of CPMACVV cleaning during AOH of Unit-8. CSTPS. Annual contract for taking observation and allied works at 6ral Dam at CSTPS. Procurement of SS shields of boiler tube during AOH of Unit 8 & 9 at CSTPS.
|
Value :
INR 30.73 Lac
*
|
INR 3.07 Mn
*
|
Due Date :
8 Days to go
|
15/06/2024
|
TID :72296298
Maharashtra
|
|
|
5. Sector : Administrative Offices
Supply of USB CABLE, 9v battery rechargeable, 9V Battery Charger, L293D Motor Driver Shield, 150 RPM BO Motor, Glue Sticks Pack of 36, Double Side Tape, Tapes, Power Bank, 9V Battery, Switch, LDR Module, Battery Clips with DC Jack, SD Card, Pen Drive, First AID Kit, Scissors, USB Adapter With Type C, Soldering Wire, Soldering Flux, Envie AA Battery Charger, Wireless Mic with Charging, Power Strip Adaptors, Hook up Wires, I2C Module, SIM800L V2 GSM Module, Water Pump Module, Transistor, Wheel, 3v Battery 3 Cell Holder, Foam Core Board, Fevistik, Biometric Fingerprint, Paper Cutter, LM2596 DC DC Buck Converter, Keypad, Flame Sensor, Relay Module 5V 2A 1 Channel, 4 Channel relay Module, Chassis, Wire Strippers, Digital Multi Meter, DC Motor 5V, Analog ph sensor kit for arduino, Bluetooth, Arduino Uno DIP, Male Male Pack of 40, Male Female Pack of 40, Female Female Pack of 40, Cutting Chopping board, CO2 Carbon Dioxide Gas, MLX90614 - ATAL EQUIPMENTS Qty 442
|
Value :
INR 5 Lac
*
|
INR 5 Lac
*
|
Due Date :
4 Days to go
|
11/06/2024
|
TID :72141787
Jammu-kashmir
|
|
|
|
|
|
|