1. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the City Gurugram Division (Package-1 consisting IDC and New Palam Vihar S/Divns) under Gurugram-I Circle which inter-alia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Re-conductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs . Implementation of Loss Reduction Works (under RDS Scheme) in City Gurugram Division (Package-1 consisting of IDC and New Palam Vihar S/Divns) under Gurugram-I Circle
|
Value :
14.14 Cr
*
|
141.41 Mn
*
|
Due Date :
3 Days to go
|
19/06/2024
|
TID :68766949
Haryana
|
|
|
2. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Mahendragarh Division (Package-1 consisting City Mahendragarh S/Divn) under Narnaul Circle which interalia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Re-conductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs . Implementation of Loss Reduction Works (under RDS Scheme) in Mahendragarh Division (Package-1 consisting of City Mahendragarh S/Divn) under Narnaul Circle
|
Value :
14.06 Cr
*
|
140.62 Mn
*
|
Due Date :
3 Days to go
|
19/06/2024
|
TID :68766944
Haryana
|
|
|
|
|
|
|
|
8. Sector : Coal and Lignite
Supply of HT Switchboard panel (non flameproof) / VCB panel 14 panel, 3 3KV, 630A, HT Switchboard panel (non flameproof) / VCB panel 13 Panel, 3 3KV, 630A, HT Switchboard panel (non flameproof) / VCB panel 11 Panel, 3 3KV, 400A, HT Switchboard panel (non flameproof) / VCB panel 9 Panel, 3 3KV, 400A, HT Switchboard panel (non flameproof) / VCB panel 5 Panel, 3 3KV, 1250A, HT Switchboard panel (non flameproof) / VCB panel 5 Panel, 3 3KV, 630A, HT Switchboard panel (non flameproof) /VCB panel/VCB single panel, 6 6KV, 800A Qty 17
|
Value :
INR 3.43 Cr
*
|
INR 34.34 Mn
*
|
Due Date :
17 Days to go
|
03/07/2024
|
TID :72766523
Madhya Pradesh
|
|
|
|
|