1. Sector : Railways Transport Services
Earthwork in cutting and filling, blanketing,construction of minor bridges, major bridges, RUB, ROB, retaining wall, Level crossing, side drain, catch water drain, P. Way work and other ancillary works in between Kalipahari to upto Asansol Divisin including yard from IR Ch. 205.400 Km to 260.2 Km in connection with construction of multi tracking Railway BG line.
|
Value :
INR 947.57 Cr
*
|
INR 9.47 Bn
*
|
Due Date :
26 Days to go
|
12/07/2024
|
TID :72464648
West Bengal
|
|
|
2. Sector : Railways Transport Services
Earthwork in cutting and filling, blanketing, construction of minor bridges, major bridges, RUB, ROB, retaining wall, Level crossing, side drain, catch water drain, P. Way work and other ancillary works in between Kalipahari to Jurisdiction of Asansol Division including yard from IR Ch. 205.000 Km to 260.2 Km in connection with construction of multi tracking Railway BG line.
|
Value :
INR 947.57 Cr
*
|
INR 9.47 Bn
*
|
Due Date :
26 Days to go
|
12/07/2024
|
TID :72464650
Multi State
|
|
|
3. Sector : Railways Transport Services
Construction of Earth work, Major Bridges, Minor Bridges, Road Over Bridges, Road Under Bridges, Limited Height Subways/Pedestrian Crossing, Retaining Wall, Drains, Track Laying and Civil Works including Station Buildings, Service Buildings, Platforms, Residential Quarters, Station Machinery, Compound Wall and Fencing along the alignment from Solapur (Ch (-) 1086) to Tuljapur (Ch 52500) except Ch. 45760 to Ch.48660 (i.e., except Tunnel Portion) in connection with New Line section under Solapur Division of Central Railway (the "Project").
|
Value :
INR 942.03 Cr
*
|
INR 9.42 Bn
*
|
Due Date :
51 Days to go
|
06/08/2024
|
TID :72138138
Maharashtra
|
|
|
|
5. Sector : Railways Transport Services
Earth work in embankment and cutting including blanketing, construction of Minor Bridges and Major Bridges, Retaining/Toe wall, RUB/LHS construction/extension, Side Drains, Construction of Station building LC, Platform, PF shelter, RH, Staff quarters, rest houses, offices, workshop, stores and other miscellaneous structural works and other allied works between Khairahi (Excl.) (186.50 Km) to Chopan in C/W Doubling of CAR-CPU section and construction of two lane ROB at LC No.-37 in Sonbhadra yard.
|
Value :
INR 357.16 Cr
*
|
INR 3.57 Bn
*
|
Due Date :
39 Days to go
|
25/07/2024
|
TID :72806687
Uttar Pradesh
|
|
|
6. Sector : Railways Transport Services
Earth Work in Embankment and Cutting Including Blanketing, Construction of Minor Bridges and Major Bridges, Retaining/toe Wall, Rub/LHS Construction/extension, Side Drains, Construction of Station Building Lc, Platform, Pf Shelter, Rh, Staff Quarters, and Other Miscellaneous Structural Works and Other Allied Works Between Chunar (incl.) (243.00km) to Khairahi (incl.) (186.50 Km) in C/w Doubling of Car-cpu Section.
|
Value :
INR 336.79 Cr
*
|
INR 3.36 Bn
*
|
Due Date :
17 Days to go
|
03/07/2024
|
TID :72111355
Multi State
|
|
|
7. Sector : Railways Transport Services
Earthwork in cutting and filling, blanketing, construction of minor bridges, major bridges, ROR, RUB, ROB, retaining wall, Level crossing, side drain, catch water drain, P Way work and other ancillary works in between Kalipahari to Andal including yard from IR Ch. 189.40 Km to IR Ch. 205.000 Km in connection with construction of multi tracking Railway BG line.
|
Value :
INR 302.42 Cr
*
|
INR 3.02 Bn
*
|
Due Date :
19 Days to go
|
05/07/2024
|
TID :72464649
Multi State
|
|
|
8. Sector : Railways Transport Services
Earthwork & Blanketing in Embankment /cutting in Formation of Bg Line Including Yards, Bridge Approaches Etc., Construction of Bridge Work (major/minor & Road Over Bridges- Sub Structure and Super Structure) as Per Railway's Approved Design and Drawing, Construction of Retaining/boundary/toe Wall/diversion Drain, Construction of Station Buildings, Covering Shed at Choral Station, Passenger Amenities, Foot Over Bridge, Yard Drain, Supply & Spreading of Machine Crushed Stone Ballast, Laying and Linking of Bg Track for Main Line, Loop Lines and Points & Crossing Etc. in Section/ Yards, Transportation of P.way Materials, Welding of Rails, and Other Incidental Miscellaneous Works Etc. Between Choral (including) (ch48920) - Mukhtiyara Balwada (excluding) (ch64380), Circulating Area, Rcc Road, Rcc Over Head Tank and Other Miscellaneous Works at Choral Stations in Connection with Gauge Conversion of Dr. Ambedkar Nagar (mhow) - Sanawad Section in Ratlam Division of Western Railway as Per Requirement Given in the Tender Document. No No Not Allowed 13 for Two Packet System Tender- Check List of Important Documents, Declaration From Tenderers, Vendor Mandate Form, Top Sheet, Certificate of Familiarisation, Self Certificate in Support of Site Visit, Instructions to Tenderers, General Conditions of Contract, Notes on Schedules, Safety Rules, Special Conditions Etc. Have Been Uploaded Which Are Integral Part of the Etender. Tenderers Are Requested to See the Above Uploaded Documents and Act Accordingly. No No Not Allowed Page 49 of 55 Run Date/time 15/05/2024 183625 Dyce-c-i-ind-engineering/western Rly Tender Document Tender No Dadn-swd-rkgc-11 Closing Date/time 05/07/2024 1500
|
Value :
INR 261.78 Cr
*
|
INR 2.61 Bn
*
|
Due Date :
19 Days to go
|
05/07/2024
|
TID :72091149
Multi State
|
|
|
|