|
2. Sector : Non Classified
Spiral Wound Gaskets
|
Value :
KZT 6.91 Cr
*
|
KZT 69.14 Mn
*
|
Due Date :
10 Days to go
|
13/05/2024
|
TID :71664369
Kazakhstan
|
|
|
|
|
5. Sector : Insurance Services
Supply of S4980 Rinse Solution, S8375 Cleaning Solution, S1820 Calibration Solution1, S1830 Calibration Solution 2, D 799 pO2 membrane box, D 788 pCO2 membrane box, D 711 Reference membrane box, D 722 Kplus membrane box, D 755 Naplus membrane box, D-744 Cl membrane box, D733 Ca plus2 membrane box, D7077 Lac Membrane box, Calibration gas one, Calibration gas two, Reference Electrode, E788 pCO2 electrode, E 799 pO2 electrode, E777 pH electrode, E 722 K electrode, E755 Na electrode, E744 Cl electrode, Lactate Electrode, ABG Thermal Printer Paper 112 mm, Early maintaince kit, Hypochlorite solution, Inlet GasKet - S4980 Rinse Solution. Qty 422
|
Value :
INR 47.63 Lac
*
|
INR 4.76 Mn
*
|
Due Date :
17 Days to go
|
20/05/2024
|
TID :71603091
Haryana
|
|
|
6. Sector : Coal and Lignite
Supply of Key, Part No 590bd221260231001, Pump Shaft, Part No 590bd221260231002, Oil Ring, Part No 590bd221260231003, Oil Cap, Part No 590bd221260231004, Dust Cover, Part No 590bd221260231005, Split Gland, Part No 590bd221260231007, Water Seal Ring, Part No 590bd221260231009, Shaft Sleeve, Part No 590bd221260231010, Wearing Ring Casing, Part No 590bd221260231012, Grub Screw, Part No 590bd221260231013, Pipe Plug, Part No 590bd221260231014, O Ring, Part No 590bd221260231015, Middle Body Stage, Part No 590bd221260231016, Combined Diffuser and Return Vane, Part No 590bd221260231017, Impeller Key, Part No 590bd221260231018, Neck Bush, Part No 590bd221260231021, Dowel Pin, Part No 590bd221260231022, Impeller, Part No 590bd221260231023, Delivery Diffuser, Part No 590bd221260231024, Stay Bolt, Part No 590bd221260231025, Washer, Part No 590bd221260231027, Nut, Part No 590bd221260231028, Balance Valve, Part No 590bd221260231033, Large Seating and Bush, Part No 590bd221260231031, Counter Sunk Screw, Part No 590bd221260231032, Dowel Pin, Part No 590bd221260231034, Impeller Key, Part No 590bd221260231035, Balance Valve Cover, Part No 590bd221260231036, Shaft Sleeve, Part No 590bd221260231037, Sleeve Nut, Part No 590bd221260231038, Gasket, Part No 590bd221260231040, Oil Sight Window Assy, Part No 590bd221260231043, Bearing Bush, Part No 590bd221260231044, Brg Cap and Brg Body, Part No 590bd221260231045, Dowel Pin, Part No 590bd221260231050, Gasket, Part No 590bd221260231051, Dowel Pin, Part No 590bd221260231053, Sleeve Nut, Part No 590bd221260231059, Water Slinger, Part No 590bd221260231060, Balancing Water Conn Line Assy, Part No 590bd221260231061, Cinch Fitting, Part No 590bd221260231063 Qty 121
|
Value :
INR 40.13 Lac
*
|
INR 4.01 Mn
*
|
Due Date :
7 Days to go
|
10/05/2024
|
TID :71605512
Orissa (Odisha)
|
|
|
|
|
9. Sector : Telecommunication Services / Equipments
Shifting of existing DG, Restoration Servicing commissioning of 20 15 KVA DG set, Shifting of existing 15 KVA AVR, Installation Testing commissioning of 15 KVA 3 phase 415 Volts Automatic Voltage Stabilizer, Installation Testing commissioning of Bye Pass cum LT panel, supplying fixing 88 AH Capacity DG starting battery for Base SANJY 2024 sites, Shifting of DG parts of 10 KVA water cooled silent type DG set from Sheesh Mahal to SANJY 2024 BTS site Holy cave, Shifting of DG parts of 10 KVA water cooled silent type DG set from Panjtarni to SANJY 2024 BTS site Sangam, Restoration Servicing Commissioning of 10 15 KVA DG set installed at Sh Amarnathji Yatra upper sites, supplying fixing 88 AH Capacity DG starting battery for Upper SANJY 2024 sites, supplying laying of 2 core 10 Sq mm PVC insulated PVC sheathed unarmoured copper conductor cable, supplying fixing of 63 A Double pole Side handle type On load type change over switch, supplying fixing of pendent holder, supplying Fixing of power strip of 6 Amp rating, S F of 40 Amp rating MCB type Double Pole Changeover switch, Replacement of faulty 3 pole Power Contactor, Providing labour charges for repairs top overhauling to faulty Diesel engine of 10 15 20 KVA DEA set, Replacement of Piston ring set for one piston required in major overhauling Top overhauling of 10 15 20 KVA DG sets complete as required at sites, Replacement of Piston pin, Replacement of Sleeve Cylinder, Replacement of Gasket Cylinder Head, Replacement of O Ring Sleeve Cylinder, Replacement of Hose Outlet, Replacement of Hose Inlet, Replacement of Damaged Faulty battery charger, Replacement of faulty stop solenoid, Repairing of defective stuck injector, Repairing servicing of defective stuck fuel pump, Repairing of defective Self Starter motor, Repairing of defective charging alternator dynamo, Replacement of defective AVR of alternator, Replacement of defective coupling, Replacement of defective moulded rectifier in the excitation circuit, supplying filling topping up of Transformer oil, Replacement of damaged faulty burnt Servo motor 3 Kg cm, Replacement of damaged faulty burnt Control Card of the AVR, Replacement of damaged faulty burnt Dimmer Coil 60 A, Replacement of damaged faulty burnt Buck Boost Transformer 5 KVA rating, supplying Laying of 3 5 x 25 sq mm, Round the clock operation Comprehensive maintenance Rangamore. Qty 852
|
Value :
INR 24.51 Lac
*
|
INR 2.45 Mn
*
|
Due Date :
3 Days to go
|
06/05/2024
|
TID :71393337
Jammu-kashmir
|
|
|
10. Sector : Power Plant
Procurement 300NB Dome Valve Spares installed at Ash Handling Plant Unit-8 & 9 CSTPS. Procurement of Various sizes of Spiraget gasket, Glands and Bonnet seal ring along with Bonnet seal ring for MS, HRH & CRH NRV of Main TG, STG-III, CSTPS. Supply of CIEL Valves, Diaphragms, Ejector, Nozzels for D. M. Plant of WTP-I, CSTPS. Supply of Bracing pipes for Air-preheater and duct for AOH at Unit-8 & 9, CSTPS. Supply of hydrogen gas cylinder for CSTPS. Online testing of safety valves by PC based S. V. Testing machine at Unit-8, Boiler, CSTPS. Procurement of carrying roller frames and self aligning troughing roller frames (SATR) for 1600 mm wide belt conveyor. Annual maintenance contract of Work of ACW/CCW pump for Unit-5, 6 & 7 at CSTPS, Chandrapur for 2 years. The work of complete replacement of Z-panel Assemblies in Boiler Unit-6 during AOH at CSTPS. Work of repair of Flue gas duct from ECO outlet to stack inlet during overhaul in Unit-6 at CSTPS. Procurement of coal feeder outlet Transition piece for BOO Coal MIII Unit-7 at CSTPS. IN-SITU repairing of various High pressure CCI valves at TM-I during Unit-3 Annual overhaul. Procurement of spares for ash disposal line for 400NB MSERW & 250NB seamless pipe for Ash Disposal Line at Ash Handling Plant U-8 & 9. Work of drum turbo Separators and Dryer removal, cleaning and refitting and insulation of drum in U-3, 210 MW boiler during AOH at CSTPS.
|
Value :
INR 22.75 Lac
*
|
INR 2.27 Mn
*
|
Due Date :
12 Days to go
|
15/05/2024
|
TID :71483900
Maharashtra
|
|
|