|
|
|
4. Sector : Corporations/ Assoc/ Chambers/ Govt Agencies
Construction of the Project And The Realization of the Construction "ETCS Plzen (outside) – Cheb", Design of building within the meaning of Annex No. 5 to Decree No. 146/2008 Coll., Is the project documentation for the construction of a railway and a one-way railway, including the design documentation for the building permit or for the short-term notice and the project documentation for the execution of the construction, Implementation of the construction means the supply and installation of railway communication and signaling equipment, the execution of minor construction modifications, necessary air conditioning and power supply, The implementation of the construction is based on the national implementation plan ERTMS (European Rail Traffic Management System) for the Czech Republic, approved by the Minister of Transport's meeting on September 18, 2007, as amended by the subsequent approved updates and changes.
|
Value :
CZK 7687.35 Cr
*
|
CZK 76.87 Bn
*
|
Due Date :
21 Days to go
|
10-05-2018
|
TID :28722244
Czech Republic
|
|
|
|
|
|
8. Sector : Dam Work
Execution of narmada – kshipra multipurpose project on “turnkey” basis comprising of lifting of 15 cumec water from osp reservoir, out of this 10 cumec water for irrigation in 30,000 hectare for providing water with micro-irrigation up to 2.5 hectare chak with residual head of 20 meters at 2.5 hectare chak and 5 cumec water to provide for domestic and industrial use of dewas, ujjain and nagda area. This includes work of survey, planning, design, drawing, estimation, land acquisition/purchase, preparation and obtaining all statutory clearance, shifting and reinstallation of existing h.t. And l.t. Electrical lines, telephones lines, water supply lines etc. Execution and installation of electric lines from m.p.p.k.v.v.c.l. Substation to various pumping stations with all
Clearances from statutory authorities. Supply, installation and testing of suitable pumps and motor with related electrical components including regulation and control of complete system by scada, construction of pump houses, control rooms, rising
Mains, gravity mains, break pressure tanks and all inline structures including road crossing of highway and other roads, pipe line etc. With all clearances from the respective authorities, supplying and fixing of miscellaneous accessories of pump houses, rising mains etc. Construction of underground piped main canal and distribution
Network up to 2.5 ha. Chak for culturable command area, construction of residential and nonresidential buildings with approach roads, internal roads at the pump house locations, preparation of all relevant documents for constitution of water user association of command area and all other miscellaneous works related to entire system as directed by engineer-in-charge during construction. Power consumption (including all types of power) in the whole system should not exceed 78.40 mw at the Time of commissioning and 79 mw in 15 years lifetime, commissioning of the entire system and operation and maintenance of complete commissioned system for 24 months.
|
Value :
INR 1938 Cr
*
|
INR 19.38 Bn
*
|
Due Date :
31 Days to go
|
20-05-2018
|
TID :28826171
Madhya Pradesh
|
|
|
|
|