Power Plant | Uttar Pradesh | TID: 11788264
1 Design, Engineering, Manufacture, Supply, Erection, Commissioning Works For Hvac System Package For 1x500 Mw, Fgutpp, Unchahar Project. | Due on 29-Sep-2014  |  View for FREE  |  Document Available  |  Like  | Tender Cycle
Power Plant | Uttar Pradesh | TID: 11788373
2 Design, Engineering, Manufacture, Supply, Erection, Commissioning Works For Electrical Systems Package For 1x500 Mw, Fgutpp, Unchahar Project. | Due on 29-Sep-2014  |  View for FREE  |  Document Available  |  Like  | Tender Cycle
Power Plant | Uttar Pradesh | TID: 11788438
3 Design, Engineering, Manufacture, Supply, Erection, Commissioning Works For Cw System Equipment Package For 1x500 Mw, Fgutpp, Unchahar Project. | Due on 29-Sep-2014  |  View for FREE  |  Document Available  |  Like  | Tender Cycle
Power Plant | Uttar Pradesh | TID: 11788551
4 Complete Miscellaneous Pumps Package Including Design, Anufacture, Assembly, Inspection, Testing And Transportation, Etc For 1x500 Mw, Fgutpp, Unchahar Project. | Due on 26-Sep-2014  |  View for FREE  |  Document Available  |  Like  | Tender Cycle
Power Plant | Delhi | TID: 11791122
5 Design & Engineering, Manufacturing, Assembly, Painting, Inspection & Testing, Packing And Delivery At Site, Loading & Unloading, Civil Construction Works (Only For Pt & Let System As Specified In Specification), Storage & Handling At Site, Erection And Commissioning At Site, Start-Up & Commissioning Spares As Required, Mandatory Spares, Recommended Spare, Site Testing And Performance Guarantee/ Demonstration Test And Handing Over Water Treatment Packages (Pretreatment Plant, Let System, Ro-Dm Plant, Condensate Polishing Unit, Cw Treatment Plant, Chlorination Plant & Chemical Laboratory) To The Customer Of 1 X 500mw, Feroze Gandhi Unchahar Thermal Power Project Stage-Iv. The Scope Of Supply Shall Fully Cover The Requirement Of The Design Criteria And Technical | Due on 26-Sep-2014  |  View for FREE  |  Document Available  |  Like  | Tender Cycle
Power Plant | Delhi | TID: 11791162
6 Design, Engineering, Manufacture, Shop Fabrication, Assembly, Type Testing, Inspection And Testing At Manufacturer’s And/Or His Sub-Contractors Works, Proper Packing, Delivery At Site, Transportation, Unloading/Handling At Site,Taking Delivery Of Employer’s Supplied Materials From Employer’s Stores, Storage At Site, Preservation At Site, Assembly, Civil Works, Erection, Site Painting, Commissioning, Testing Of Station Lighting Package, Performance Testing Including Supply Of Mandatory Spares, Special Tools & Tackles For Maintenance ,Start-Up ,Pre Commissioning & Commissioning Spares As Specified & As Necessary For Completeness In All Respects And For Efficient & Trouble Free Operation Of Station Lighting Package For Feroze Gandhi Unchahar Thermal Power Project – Stage Iv, (1 X 500 Mw). | Due on 26-Sep-2014  |  View for FREE  |  Document Available  |  Like  | Tender Cycle
Power Plant | Uttar Pradesh | TID: 11718775
7 Design, engineering, manufacture, supply, transportation, storage, testing, erection, commissioning works for station piping package, water treatment package (PT, LET, RO-DM, CPU, CWTP etc), Miscellaneous pumps package, electrical systems package, fire protection system, fuel oil unloading & miscellaneous tanks package, CW system equipment package, station lighting package, HVAC package. | Due on 30-Sep-2014  |  View for FREE  |  Like  | Tender Cycle
Power Plant | Delhi | TID: 11782120
8 Material handling and management work involving receipt, unloading, verifying, shifting, stacking of cement and steel. | Due on 30-Sep-2014  |  View for FREE  |  Like  | Tender Cycle
Power Plant | Uttar Pradesh | TID: 11784845
9 Material Handling & Management Work involving Receipt, Unloading, Verifying, Shifting, Stacking of Cement & Steel. | Due on 30-Sep-2014  |  View for FREE  |  Like  | Tender Cycle
Power Plant | Uttar Pradesh | TID: 11791192
10 Design, Engineering, Manufacture, Supply, Erection, Comissioning Works For Station Piping Package For 1x500 MW, FGUTPP, Unchahar Project | Due on 26-Sep-2014  |  View for FREE  |  Like  | Tender Cycle
Show     Tenders
Set Free email Alert    >> BHEL
Sort By   
Search Within Search Within