The Global Tender Portal
Searching Tenders? Get daily alerts. Register / Call now
Advance Search
Railways Transport Services | Telangana | TID: 17534420
1 Value: INR 594.22 Million approx. / 59.42 Crore approx. | Category A of Divisions Over S.C.Rly For Leasing Of Parcel Vans On Round Trip Basis Between Stations By The Trains Given In The Tender Notification For Transportation Of Parcels.
Due on 04-May-2016  |  2 Days to go
View for FREE  |  Document Available  |  Like  |  Ask Expert
Railways Transport Services | Telangana | TID: 17614679
2 Value: INR 454.69 Million approx. / 45.46 Crore approx. | Kazipet - Balharshah section Proposed Third line between Balharshah -Kazipet stations - Execution of Earth work in embankment and cutting, blanketing to the standards of GE.14, Construction of minor bridges and execution of Miscellaneous works (Excl. Major Bridges) including clearing the S & T obstructions from Ch.203000 to 250250 between Sirpurkaghaznagar (excl.)-Mandamari (incl.) stations (Reach-IV).(Two Packet System).
Due on 10-May-2016  |  8 Days to go
View for FREE  |  Document Available  |  PQ Available  |  Like  |  Ask Expert
Railways Transport Services | Multi State | TID: 17590505
3 Value: INR 454.69 Million approx. / 45.46 Crore approx. | Modernization of rayanapadu wagon work shop and proposed extension of paint shed by 22.5 m towards end, construction of open gantry structure at component shop for the operation of 20T EOT crane, construction of covered shed for stacking of steel items in existing steel yard, construction of covered shed for stacking electrical cable drums and construction of store shed 18mx 12 m for stacking of materials and execution of other miscellaneous works.
2. Earth work in formation, construction of island platform between road nos 4 to 7, cover over platform, dismantling of existing tracks, transportation of p way materials, supply of stone ballast, laying and linking of BG track, assembling and insertion of points and crossing and other connected miscellaneous works.
3. Proposed third line with electrification between stations earth work in embankment including blanketing to GE 0014 specification and extension of minor bridges, construction of relay, battery and equipment room and other connected miscellaneous works.
4. Modernization of rayanapadu wagon work shop, provision construction of office building for SSES and staff of under gear stores, construction of rest room cum dress change room for ladies, construction of lavatories and urinals for staff at 7 locations, paving at different locations and execution of other miscellaneous works.
5. Proposed construction of 3rd line between stations, dismantling of existing tracks, transportation of p way materials, supply of stone ballast, laying and linking of BG track, assembling and insertion of points and crossing and other connected miscellaneous works.
6. Construction of new BG line between various stations proposed supplying and stacking of track stone ballast, machine crushed, clean, hard, angular and durable along side of proposed alignment, station yards.
7. Reconnaissance engineering cum traffic survey for a new BG line between stations stations.
8. Proposed line between various stations execution of earth work in embankment and cutting, blanketing to the standards of ge 14, construction of minor bridges and execution of miscellaneous works including clearing the S&T obstructions.
9. Proposed third line between various stations proposed construction of important bridge no 29/8, open web steel girder with well foundations, substructure, bed blocks excluding super structure and approach earth work in embankment and blanketing from stations.
10. Proposed third line between various stations proposed construction of major bridge no 269 at Ch 158752 m, PSC girders, with well foundation including approach earth work in embankment between stations.
11. Proposed patch tripling between stations proposed laying and linking of BG track, assembling and insertion of points and crossing, leading and dumping of stone ballast, transportation of PW materials and execution of other miscellaneous works including on bridge.
12. Proposed construction of canal crossing as 1x4.00x2.40 RCC box, RCC twin box by pushing technique.
13. Proposed third line between various stations proposed construction of major bridge with open foundations and substructure but excluding super structure and execution of earth work for approaches including blanketing materials to GE 0014 and connected protective works.
14. Proposed third line between various stations proposed casting, transportation and launching of precast pre post tensioned PSC slabs of different spans for major and minor bridges and RCC ballast retainers between stations.
15. Construction of new BG line between various stations laying and linking of new BG track for track machine siding, shunting neck, turnouts, dismantling of existing lines, laying of new lines, cut and connection of bidr gr line with gr sur main lines, transportation, dumping, spreading of stone ballast from various km, transportation of p way materials, miscellaneous works.
16. Construction of new BG line between various stations remodeling of nandyal yard and other balance track linking works including transportation of p way materials providing re railing ramps at bridge.
17. Proposed third line between stations proposed construction of br no 94 at chainage 296909.78m as 5x12.20 PSC girder,with open foundations including protective works, earth work in approaches and other miscellaneous works.
Due on 10-May-2016  |  8 Days to go
View for FREE  |  Like  |  Ask Expert
Railways Transport Services | Multi State | TID: 17591227
4 Value: INR 348.81 Million approx. / 34.88 Crore approx. | Hiring of one no multi utility vehicle MUVS like sumo, bolero, scorpio, xylo.
2. Proposed construction of road over bridge in lieu of LC no 127 at km 210/1-2 composite girder steel I girders and RCC deck slab with open foundation.
3. Construction of bridge no 45 at km 240/9-241/4 across pennar river proposed as 1x17.80+24x18.30 + 1x17.80 m with PSC girder on well foundations including earth work in approaches for two tracks.
4. Construction of new BG line between and stations proposed construction of road over bridge RCC slab clear span composite girder girder with RCC deck slab RCC slab in lieu of cart track at ch 48200 m near village, road over bridge clear span PSC I girders with deck slab.
5. Construction of new BG line between various stations construction of sub way with 1x5.0 m x 3.0 m RCC box at stations, RUBS with RCC box, including concrete roads and retaining walls connected with miscellaneous works.
6. Construction of new BG line between proposed widening of high banks, flattening of side slopes of unstable cuttings and removal of cut spoils from the cutting mouth of cuttings with miscellaneous works.
7. Development of coaching facilities at construction of new shed for intermediate overhauling of bogies of size 18.40 x 50 m long with gantry arrangements, service building near the shed and miscellaneous works, construction of SSE, P way, SSE works and SSE and S&T offices and miscellaneous works, construction of staff quarters.
Due on 06-May-2016  |  4 Days to go
View for FREE  |  Like  |  Ask Expert
Railways Transport Services | Telangana | TID: 17614552
5 Value: INR 279.08 Million approx. / 27.90 Crore approx. | Proposed Third Line Between Balharshah -Kazipet Stations - Proposed Construction Of Br.No. 94 at Chainage 296909.78m As 5x 12.20m PSC Girder, Br.No.93 At Chainage 297963.10m As 5 X 6.10m PSC Slab, Br.No. 90 At Chainage 300730.53m As 2x13.60m PSC Girde, Br.No. 52 At Chainage 334487.42m As 4x 12.20m PSC Girder, Br.No.39 At Chainage 344007.20m As 5 X 12.20m PSC Girder, Br.No. 38 At Chainage 344790.21m As 1x13.60m PSC Girder, Br.No.31 At Chainage 348085.29m As 2x 12.20m PSC Girder, Br.No.28 At Chainage 349346.23m As 4 X 12.20 PSC Girder, Br.No.22 At Chainage 353257.470 M As 3 X 6.10m PSC Slab And Br.No.13A At Chainage 357485.42m As 5 X 9.15m PSC Girder,With Open Foundations Including Protective Works, Earthwork In Approaches And Other Miscellaneous Works Between Raghavapuram- Kazipet Stations.(Two Packet System).
Due on 10-May-2016  |  8 Days to go
View for FREE  |  Document Available  |  PQ Available  |  Like  |  Ask Expert
Railways Transport Services | Telangana | TID: 17614561
6 Value: INR 221.94 Million approx. / 22.19 Crore approx. | Kazipet - Balharshah Section Proposed Third Line Between Balharshah -Kazipet Stations, Proposed Construction Of Important Bridge No. 298 At Ch137325 M (137/20 To 137/2) On Wardha (Penganga) River As 1x60.31m+5x60.85m+1x60.31m (Clear Span) Open Web Steel Girder With Well Foundations, Substructure, Bed Blocks (Excluding Super Structure) And Approach Earthwork In Embankment & Blanketing From Ch136975 M To Ch 137675 M Between Manikgarh And Balharshah Stations).(Two Packet System).
Due on 10-May-2016  |  8 Days to go
View for FREE  |  Document Available  |  PQ Available  |  Like  |  Ask Expert
Railways Transport Services | Telangana | TID: 17675946
7 Value: INR 201.30 Million / 20.13 Crore | Supply, Stacking of 50mm Gauge Hard And Durable Machine Crushed Stone Ballast To Railwayâ??S Specification At Railway Depot At GANGINENI Station In Secunderabad Division And Loading The Same Into Railway Hoppers/Traffic Ballast Wagons By Mechanical Means (Two Packet System).
Due on 11-May-2016  |  9 Days to go
View for FREE  |  Document Available  |  Like  |  Ask Expert
Railways Transport Services | Telangana | TID: 17557207
8 Value: INR 160.52 Million approx. / 16.05 Crore approx. | Proposed Third line between Vijayawada and Bhimadolu stations- Construction of Major Bridge No.10 @KM 442.03 & Bridge No.13 @Km 445.95 proposed as 3X12.20m PSC slab , Bridge No. 57 @ Km 471.54 proposed as 9X 12.20m PSC Slab and Bridge No.104@ Km 490.74 proposed as 12 X 12.20m PSC Slab with Pile foundations (excluding PSC superstructure work) including Earth work on approaches to GE-14 standards between Mustabad and Denduluru stations. (Two Packet System).
Due on 06-May-2016  |  4 Days to go
View for FREE  |  Document Available  |  PQ Available  |  Like  |  Ask Expert
Railways Transport Services | Telangana | TID: 17925225
9 Value: INR 120.35 Million approx. / 12.03 Crore approx. | Elimination Of 5 (Five) Manned Level Crossing Gates On Sc – Dhne Section By Providing Rubs (Lc Gate No’s 32,36,37,41 And 43) – Two Packet System.
Elimination Of Manned Level Crossing Gate No.220 On Sc – Mue Section By Providing Rub.
Hiring Of 6 Ton Vehicle For Track Maintenance Work Under The Control Of Sse/P.Way/ For A Period Of 2 Years. Hiring Of 6 Ton Vehicle For Track Maintenance Work Under The Control Of Sse/P.Way/Umri For A Period Of 2 Years.
Due on 02-Jun-2016  |  31 Days to go
View for FREE  |  Document Available  |  Like  |  Ask Expert
Railways Transport Services | Telangana | TID: 17557206
10 Value: INR 96.14 Million approx. / 9.61 Crore approx. | Duvvada - Vijayawada Section - Proposed Third Line Between Vijayawada And Bhimadolu Stations- Casting, Transportation & Launching of PSC Slabs For Minor & Major Bridges Between Vijayawada Junction & Bhimadolu Stations.
Due on 06-May-2016  |  4 Days to go
View for FREE  |  Document Available  |  PQ Available  |  Like  |  Ask Expert
Show     Tenders
Set Free email Alert   » SOUTH CENTRAL RAIL...
Sort By :  
Filter Tenders By Due Date
- Closing Today
- Closing Tomorrow
- Closing Next 7 Days
- Closing Next 15 Days
- Closing Next 30 Days
Search Within Search Within  
Filters Applied
Company : south central railway
Advertisements
Liaison Agent Registration
comAfriwood
concreteshowindia
Win Tender
Sort By :  
Filters Applied