Requirement :
|
New School Center Deggendorf - 2nd BA - Vocational School I - Part 1. Demolition work; Pipe trench and pipe; Construction work; Estricharbeiten; Tile and plate works; Flooring work; Working with wood flooring; Facade work; Scaffolding; Locksmith work outside and inside; Trockenbauarbeiten; Metallbauarbeiten; Painting; Carpentry; Window Working; Interior-permanent installations; Heater; Ventilation; Refrigeration; Sanitary; Insulation; Building automation; Power installations; lighting; Alarm systems; Media Technology; Computer equipment; Elevator; Outdoor facilities; kitchens; Lightning protection; Floor coating work; Sonnenschutzarbeiten; partitions; locking system; signs; Trafostation; Parking and drainage systems; Site road, roof waterproofing, profiled glass, locksmith garage doors, electrical, shading, MSR technology, technical gases.
|