Requirement :
|
Construction Of Mohapura Left Bank System To Deliver Water At Farmers Field Upto 1 Ha. From The Existing System With A Duty Ranging From 0.33 To 0.35 Liters Per Sec Per Ha And Maintained Up To 30 Ha Chak And Discharge Of Minimum 10 Times The Duty At One Hectare By Pressurized Pipe Line System For Sprinkler Micro Irrigation In The Approximate Culturable Command Area Of 92500 Ha Out Of Approximate Gross Command Area Of 135371 Ha. The Work Also Includes All Activities Starting From Survey, Investigation, Designing, Procurement, Construction, Laying, Installing, Energizing Etc Of Pumping System, Rising And Gravity Mains, Main Line, Branch Lines, Distribution Network, Controlling And Regulation System Etc For Supply Of Water For Irrigation Under Pressure With Scada And Automation. The Work Also Includes Management, Operation And Maintenance Mom Of Complete Scheme For The Period Of Three Years
|