Requirement :
|
Survey,Planning,Design, Construction and handing over of 8,917 EWS DUs/Flats (each of super builtup area of 300 sft),11,147 EWS DUs/Flats (each super builtup area (each of super built up area of 365 Sft) and 2,230 EWS DUs/flats (each of superbuilt up area of 430 Sft) (Total 22,294 EWS DUs/Flats) in G+3 pattern with Monolithic Concrete Construction (Shear wall technology) and with suitable foundations as per soil conditions including Internal Infrastructure facilities such as water supply, sanitary, Electrification under PMAY (HFA) with 2 years defect liability period under EPC System at Guntur, Chilakaluripeta, Repalle, Piduguralla, Vinukonda, Macherla, Tadepalli and Tenali ULBs of Guntur District and Markapur & Ongole ULBs of Prakasam District.
|