Requirement :
|
Implementation of the full range of works on the construction of cable lines 2KL-10 kV from TP-0.5.02 (block 0.5) to TP-0.6.02 (block 0.6), from TP-0.6.02 (block 0.6) to TP-0.7.02 ( block 0.7), from TP-0.7.02 (block 0.7) to TP-0.8.02 (block 0.8) with installation of three TP-10 / 0.4 kV (TP-0.6.02 (block 0.6), TP-0.7 .02 (block 0.7), TP-0.8.02 (block 0.8) with a capacity of 2 * 630 kVA and the construction of 0.4 kV cable lines from the TP to the boundaries of land plots (in the ASP) in blocks 0.6, 0.7, 0.8 quarters 0 (10 11th, 12th start-up complexes) of quarter No. 0 in the planning area "Akademicheskiy" of the city of Yekaterinburg. "Electricity supply networks.
|