Requirement :
|
Implementation of an incomplete works of flood protection of the town of Žamberk, which consists in construction of line measures such as new reinforced concrete walls, mobile dams, earth valleys, increasing existing coastal walls and underground brush walls. In addition, relocations of engineering networks (RWE, CEZ, CETIN, water supply, sewerage), sewerage measures (table closures, check valves, slides), measures on existing water management facilities (drift closure, weir treatment) will be implemented in the framework of VZ. Part of the event will also include cutting, pasportizing the affected roads and adjacent buildings, drawing workshop drawings to the extent necessary. For more details, see the project documentation and the works contract.
|