Requirement :
|
Major repair of the scrubbing conveyor sp-26u with new drive stations (or equivalent) (3od.), with new ramps of the closed type (every fourth with an inspection hatch) (or equivalent) (128 / 42od.), with a new 24h86 scraper chain ( or equivalent) (510m), with a new flip on the bolt mount (or equivalent) (170od.), with a new set of hinged equipment (or equivalent) (1k-t), with new hardware (or equivalent), with a new cable kgesh 3?70 + 1?10 + 1?4 (or equivalent) (510?), with a new disruption in the trolleys ??-3,3 (or equivalent) (5od.).
|