Requirement :
|
Detailed survey, design & drawing, construction of Infiltration Well, RCC Jack well with pump house, R.C.C. Gangway (20 m long and 3 m wide), 9 MLD Water Treatment Plant (WTP), 2 Nos of Elevated Service Reservoirs [ (i) 17.5 lakh liter capacity with 20 m staging for Zone – I and (ii) 7.50 lakh liter capacity with 12 m staging for Zone -II, Supplying and laying Clear Water Rising main & Distribution Network, Boundary wall, Railway crossing, Approach road, Supplying and installation of V.T pumps, CF pumps, Electric connection, Power transformer and SCADA system, House connection, Staff Quarter(s), Chlorination system for water supply work, Two years Operation & Maintenance with allied works, etc. all complete for Manjhiaon Urban Water Supply Scheme under JUIDCO Limited.
|