Requirement :
|
Construction Of Composite Gravity Dam On River Parbati Of Least Gross Capacity Of 172.54 Mcm On Turnkey Basis Comprising Of Concrete Dam Consists Of Central Overflow Portion , Non Overflow Portion And Protection In Upstream And Downstream To The Main Dam As Per Requisite Safety Arrangement, Including Survey, Geological Investigations, Marking Of Frl Line At Field, Preparation And Submission Of La Cases, Planning, Design, Estimation, Preparation Of Construction Drawings And Construction Of Concrete Dam Which Includes Ogee Spillway With Surplus Sing Arrangement And Procuring And Fixing Of Vertical Gates With Hoisting Arrangements And Easy Accessibility To Hoisting Arrangement And Energy Dissipation Arrangement, Gantry Crane, Stop Log Gates For 3 Openings At A Time, Inspection Bridge And Deck Slab Bridge Etc. Construction Of Elevator Shaft Connecting Dam Top To Inspection And Foundation Galleries Including Proper Ventilation In Galleries And Control Room I/C Under Water Lighting Arrangement, Environmental/ Silt Excluder Sluice In Dam With All Hoisting Arrangements Including Construction Of All Civil, Mechanical And Electrical Works Including Removal Of Defects, Operation And Maintenance For Three Years After Completion Of Project And Preparation Of O And M Manual, Model Study Of The Project And As Directed By The Engineer In Charge As Per Details Given In Scope Of Work.
|