Requirement :
|
Geotechnical investigation of sub-surface, survey, design, supply, installation, laying &
jointing, testing and commissioning of 1500 mm dia mild steel pipe line with Sluice
valve, Scour valve, Air valve, construction of Thrust block, out fall structure, end connection with all other required fitting as per design to convey treated effluent (with
inside cement mortar lining and outside epoxy coating) including operation and
maintenance for five years at Goithaha STP.
|