Part Design and Construction of Elevated Viaduct and Six Elevated (excluding Architectural finishing ) from Chainage 625.00 m to 7747.00 m of Bhubaneswar Metro Phase-I MRTS. at Bhubaneswar,Orissa (Odisha),India
Classified in :
#Viaduct
#Tunnel Work