Design and Construction of Elevated Metro Viaduct for NMRP Phase-2 in I. Between Ch (-) 7577.056 m to Ch (-) 13457.046 m of length 5.9 km in Reach 2B II. Between Ch 18218.586 m to Ch 24633.194 m of length 6.414 km in Reach 3A III. Between Ch (-) 289. at Nagpur,Maharashtra,India
Classified in :
#Viaduct
#Tunnel Work