4.
Chhattisgarh Tenders
Biz value: INR 345.98 Cr
Bid Before:03 October 2023 10 Days to go
Public Health Engineering Department
Design, Drawing, Construction, Testing, Commissioning of Floating Pontoon, Raw Water Electric substation (33/630 KVA), Raw water pumps (240 BHP, Discharge 631000 LPH, Head 65m 3 Nos.) and motors with manifold arrangement, Water Treatment Plant (28.5 MLD), Clear water Electric substation (33/0.415 KVA) clear water pump (6 Nos. of 250 BHP, Discharge 302794 LPH, Head 140m, each) and motors with manifold arrangement MBRs, Providing, laying, jointing and testing & commissioning of Raw water (600mm Dia., DI K-9 Length-3000m) & Clear water Pumping Main of DI K-9 pipe, (600mm Dia., Length-12230m) Clear Water Gravity main pipe from Z-MBR to 8 various MBR (DI K-7 900mm to 200mm dia., Total Length-129148m), Clear Water Gravity Main from MBR’s to various OHT’s (500mm-110mm dia. OPVC/DI K-7 pipe, Total Length 640236m) with all required valves & specials, to 245 villages OHT’s and all allied civil works including boundary wall around WTP campus, CC road inside WTP & on Floating Pontoon site to facilitate movement of goods and materials, providing and fixing Bulk flow meters, including integration of all component & Testing and trial run comprises of 3 months testing and 9 month of trial run.AITMA NAGAR MULTI VILLAGE SCHEME
Tag a friend
Hashtag & Get Tender
Probable Participants
7.
Chhattisgarh Tenders
Biz value: INR 51.35 Cr
Bid Before:24 September 2023 1 Day to go
Public Health Engineering Department
Design, Drawing, Construction, Supply & Installation of E/m Equipment, Testing & Commissioning of Component I.e. Intake Well, Raw Water Electric Sub Station I/c Raw Water Pumps and Motors, Water Treatment Plant, Clear Water Electric Substation I/c Clear Water Pumps and Motors, of 02 No. Mbr, Providing, Laying, Jointing and Testing & Commissioning of Raw Water & Clear Water Pumping Main of Di K-9 Pipe, Clear Water Gravity Main of Di K-7& O-pvc Pipe with All Required Valves & Specials, All Allied Civil Works Includingconstruction of Boundary Wall Around Wtp Campus Mbr and Cc Road with in Wtp and Upto Intakewell Site to Facilitate Movement of Goodsmaterials, Providing and Fixing of Bulk Flow Meters, Construction of I &h Type Quarters, Supply and Testing Trial Run of Entire Scheme for 12 Month After Completion of All Components of the Scheme (with Defect Liabilities Period of 1 Year Which Will Run Concurrently with Trial Run Period Under Bitkuli Rampurmulti Village Water Supply Scheme of 41 Villages of Block Bhatapara , District .
Tag a friend
Hashtag & Get Tender
Probable Participants