Search the most relevant Road tenders
Get Latest Tender notices for Road tenders published by various government and private organizations on 100s of websites and newspapers,
Get complete tender information and 100% accurate details for for Road Tenders
Download all Tender documents, RFP, RFQ and more for Road Tenders
Use our advanced filter to find perfect Road Tenders by Organization, Tender value, Opening and Closing date, etc.
TID : 72571529 Dept Tender Number : Tender Type :Contract
Zone Nandyal – Tarlupadu (excluding) to Nandyal (including) for the Period From 01-07-2024 to 30-06-2025. Zone Markapur – Kurichedu (including) to Tarlapadu (including) for the Period From 01-07-2024 to 30-06-2025. Zone Nallapadu West – Kurichedu (excluding) to Nallapadu (excluding), and Guntur ( Excluding) to Krishna Canal Junction (excluding) for the Period From 01-07-2024 to 30-06-2025. Zone Guntur – Guntur Station Building and Its Premises for the Period From 01-07-2024 to 30-06-2025. @proposed Construction of Toilets for Divyang Persons at Heggere Hatl, Mallasandra, Gubbi, Nittur, Sampige Road and Yelahanka Pf No.4/5 Stations. Provision of Divyangjna Facilities Like Toilets, Drinking Water Booths, Railing, No-slippery Walkways, Ramps and Trolley Path at Various Road Stations. Proposed Drainage Arrangements at Rub No. 121/b at Km 176/400-500 Between Nagasamudram – Dharmavaram Stations in Assistant Divisional Engineer/hindupur Sub Division, Maintenance Period is 12 Months. Preparation and Submission of Dpr in Connection with Reconstruction of Robs in View of Running of Dsdc Trains and Elimination of Lc By Constructing Rob/rub. Provision of Standard Height Gauges for 14 Rubs No’s : 73, 85 , 93, 95, 96, 110, 113, 351. 356, 358, 367, 368 and 374 in Assistant Divisional Engineer / Kunigal Sub- Division, Maintenance Period is 6 Months. Through Rail Renewal 0.95 Km Length From 13/055-14/005(sl) Through Turnout Renewal of Point No. 51b at Nelamangala Yard. Strengthening of Bridge No. 268 at Km 93/000-200 in Assistant Divisional Engineer/ Yesvanthpur Subdivision. Proposed Fixing of Sign Board on Appraches of Bridges Ie Br, No 535 Up, 516 Up, 490, 480, 434, 319, 288, 285, 281, 268, 266, 259, 224, 214, and 197 of Baiyappanahalli. Proposed Fixing of Sign Boards Onm Approaches of Bridges I.e Br, No, 257 of Yealhanka- Bangarpet Section, Maintenance Period is 6 Months Or One Monsoon Period Whichever is Later. Zoen Reddipalem – Guntur (excluding Guntur Station But Including Colonies) to New Guntur (including New Guntur Station & Colony) for the Period From 01-07-2024 to 30-06-2025. Zone Nallapadu – Nallapadu Colony and Station, Railvihar Colony, Divisional Office Campus at Pattabhipuram for the Period From 01-07-2024 to 30-06-2025. Zone Repalle & New Guntur ; Guntur (excluding) to Tenali (excluding) to Repalle (including), Nallapadu (excluding) to Sattenapalli (excluding) for the Period From 01-07-2024 to 30-06-2025. Zone Piduguralla : New Piduguralla (including) to Savalyapuram (excluding), Sattenapalli (inclulding) to Nadikudi (excluding) for the Period From 01-07-2024 to 30-06-2025. Zone Nadikudi ; Tummalacheruvu (excluding) to Macheria (including), Miryalaguda (including) Ro Nadikudi (including) and Vishnupuram (including) to Janpahad (including) for the Period From 01-07-2024 to 30-06-2025. Zone Nalgonda ; Miryalaguda (excluding) to Pagidipalli (excluding) for the Period From 01-07-2024 to 30-06-2025. Provision of Abt Metering Facility for Procurement of Power Under Open Access at Malkhaid Road Traction Sub – Station in Secunderabad Division. Furnishing of Inspection Saloon Nos, 011234, 011205 & 011214 at Carriage Workshop, Lallaguda, Secunderabad. Electrification of Adee/trd Offices at Aurangabad, Parabhani & Nanded : Adste Offices at Aurangabad & Nangad; Sse (tele) Offices at Jalna & Nanded; Sse (signal) Offices at Parbhani & Selu and Electrification of 27 Units of Type – Ii 14 Units of Type – Iii and 8 Units of Type – Iv Staff Quarters at Various Stations in Manmad – Mudked Section (group – 207) of Railway Electrification Project/ Secunderabad Under of Nanded Division of South Central Railway. Design, Supply, Erection, Testing and Commissioning for 25 Kv Ohe in Trip Attention Sheds Each at Nanded, Secunderabad, Kacheguda and Nallapadu Along with Associated Psi Equipments and Control Relay Panel Under Various Divisions of South Central Railway. at Multi Location,Multi State,India