2.
Chhattisgarh Tenders
Biz value: INR 345.98 Cr
Bid Before:03 October 2023 8 Days to go
Public Health Engineering Department
Design, Drawing, Construction, Testing, Commissioning of Floating Pontoon, Raw Water Electric substation (33/630 KVA), Raw water pumps (240 BHP, Discharge 631000 LPH, Head 65m 3 Nos.) and motors with manifold arrangement, Water Treatment Plant (28.5 MLD), Clear water Electric substation (33/0.415 KVA) clear water pump (6 Nos. of 250 BHP, Discharge 302794 LPH, Head 140m, each) and motors with manifold arrangement MBRs, Providing, laying, jointing and testing & commissioning of Raw water (600mm Dia., DI K-9 Length-3000m) & Clear water Pumping Main of DI K-9 pipe, (600mm Dia., Length-12230m) Clear Water Gravity main pipe from Z-MBR to 8 various MBR (DI K-7 900mm to 200mm dia., Total Length-129148m), Clear Water Gravity Main from MBR’s to various OHT’s (500mm-110mm dia. OPVC/DI K-7 pipe, Total Length 640236m) with all required valves & specials, to 245 villages OHT’s and all allied civil works including boundary wall around WTP campus, CC road inside WTP & on Floating Pontoon site to facilitate movement of goods and materials, providing and fixing Bulk flow meters, including integration of all component & Testing and trial run comprises of 3 months testing and 9 month of trial run.AITMA NAGAR MULTI VILLAGE SCHEME
Tag a friend
Hashtag & Get Tender
Probable Participants
8.
Chhattisgarh Tenders
Biz value: INR 27.49 Cr
Bid Before:25 September 2023 Closing today
Public Health Engineering Department
Design, Drawing, Construction, Testing, Commissioning of Intake Well 6m Dia Height 25.00 90m Length Approach Bridge, Approach Road, Raw Water Electric Sub Station 100 Kva/11/0.415 Kv with All Required Work, Raw Water V.t. Pumps and Motors 3no -68906lph Discharge and 79.0m Head at Village Chainpur Near Existing Intak Well , 2.50 Mld Conventional Type Water Treatment Plant, 3 No. 45 Hp Clear Water Centrifugal Pumps and Motors 66344lph and 111m Head, Clear Water Electric Sub Station 160 Kva/11/0.415 Kv with All Required Work at Village Chainpur, 190 Kl Capacity 30 Staging Mbr-1 No at Village Chainpur and 120kl Capacity Gsr Mbr -1 No at Village Shankargarh. , Providing, Laying, Jointing and Testing & Commissioning of Raw Water Pumping Main Di K-9 250 Mm Dialength 2166 M and Clear Water Pumping Main 200 Mm Dia Di K-9 Length 7585 M & 250 Mm Dia3261 M Total Length 10846m &clear Water Gravity Mains Pipe O-pvc 250mm Dia – 10216 M., O-pvc Pipe Pn-16 160mm Dia – 19190 M., 110mm Dia – 43790m. Total Length- 73196 M with All Required Valves & Specials as Per Attached Key Plan Map, Providing and Fixing Bulk Flow Meters for Entire Scheme Upto Village Ohts, Railay Crossing at Two Site, National Highway Crossing Horizontal Pushing Method , Nala Crossing and Work Include Taking Permission to Concern Deptt. Allied All Civil Works Including Boundary Wall Around Wtp Campus Completion Period 12 Months (including Rainy Season) Including Trial Run of Entire Scheme for 12 Month After Completion of All Components of the Scheme Including Intregration of All Components Testing and Trial Run Comprises of 3 Months Testing and 9 Month of Trial Run Under Chainpur Multi Village Water Supply Scheme of Block Manendragarh, District Korea (c.g.)
Tag a friend
Hashtag & Get Tender
Probable Participants