|
|
3. Sector : Railways Transport Services
Earthwork in cutting and filling, blanketing,construction of minor bridges, major bridges, RUB, ROB, retaining wall, Level crossing, side drain, catch water drain, P. Way work and other ancillary works in between Kalipahari to upto Asansol Divisin including yard from IR Ch. 205.400 Km to 260.2 Km in connection with construction of multi tracking Railway BG line.
|
Value :
INR 947.57 Cr
*
|
INR 9.47 Bn
*
|
Due Date :
26 Days to go
|
12/07/2024
|
TID :72464648
West Bengal
|
|
|
4. Sector : Railways Transport Services
Earthwork in cutting and filling, blanketing, construction of minor bridges, major bridges, RUB, ROB, retaining wall, Level crossing, side drain, catch water drain, P. Way work and other ancillary works in between Kalipahari to Jurisdiction of Asansol Division including yard from IR Ch. 205.000 Km to 260.2 Km in connection with construction of multi tracking Railway BG line.
|
Value :
INR 947.57 Cr
*
|
INR 9.47 Bn
*
|
Due Date :
26 Days to go
|
12/07/2024
|
TID :72464650
Multi State
|
|
|
5. Sector : Railways Transport Services
Construction of Earth work, Major Bridges, Minor Bridges, Road Over Bridges, Road Under Bridges, Limited Height Subways/Pedestrian Crossing, Retaining Wall, Drains, Track Laying and Civil Works including Station Buildings, Service Buildings, Platforms, Residential Quarters, Station Machinery, Compound Wall and Fencing along the alignment from Solapur (Ch (-) 1086) to Tuljapur (Ch 52500) except Ch. 45760 to Ch.48660 (i.e., except Tunnel Portion) in connection with New Line section under Solapur Division of Central Railway (the "Project").
|
Value :
INR 942.03 Cr
*
|
INR 9.42 Bn
*
|
Due Date :
51 Days to go
|
06/08/2024
|
TID :72138138
Maharashtra
|
|
|
|
7. Sector : Railways Transport Services
Earth work in embankment and cutting including blanketing, construction of Minor Bridges and Major Bridges, Retaining/Toe wall, RUB/LHS construction/extension, Side Drains, Construction of Station building LC, Platform, PF shelter, RH, Staff quarters, rest houses, offices, workshop, stores and other miscellaneous structural works and other allied works between Khairahi (Excl.) (186.50 Km) to Chopan in C/W Doubling of CAR-CPU section and construction of two lane ROB at LC No.-37 in Sonbhadra yard.
|
Value :
INR 357.16 Cr
*
|
INR 3.57 Bn
*
|
Due Date :
39 Days to go
|
25/07/2024
|
TID :72806687
Uttar Pradesh
|
|
|
|
9. Sector : Railways Transport Services
Earth Work in Embankment and Cutting Including Blanketing, Construction of Minor Bridges and Major Bridges, Retaining/toe Wall, Rub/LHS Construction/extension, Side Drains, Construction of Station Building Lc, Platform, Pf Shelter, Rh, Staff Quarters, and Other Miscellaneous Structural Works and Other Allied Works Between Chunar (incl.) (243.00km) to Khairahi (incl.) (186.50 Km) in C/w Doubling of Car-cpu Section.
|
Value :
INR 336.79 Cr
*
|
INR 3.36 Bn
*
|
Due Date :
17 Days to go
|
03/07/2024
|
TID :72111355
Multi State
|
|
|