|
|
|
|
|
6. Sector : Banking and Mutual Funds and Leasings
Demand Management And Renewables Dps
|
Value :
GBP 80 Cr
*
|
GBP 800 Mn
*
|
Due Date :
892 Days to go
|
25/11/2026
|
TID :57054603
United Kingdom
|
|
|
|
8. Sector : Railway Ancillaries
Design, supply, testing, erection, and commissioning of Power supply installation i.e. TSS, SSP, SP on 2 x 25 KV, AC 50HZ OHE installations system and electrification of TSS, SSP, SP building, and TRD office etc. in Rewa-Sidhi-Singrauli new line section of Jabalpur division, West-Central Railway in connection with Lalitpur-Singrauli new rail line project.
|
Value :
INR 29.85 Cr
*
|
INR 298.53 Mn
*
|
Due Date :
22 Days to go
|
08/07/2024
|
TID :72900054
Madhya Pradesh
|
|
|
9. Sector : Railway Ancillaries
Design, supply, testing, erection, and commissioning of Power supply installation i.e. TSS, SSP, SP on 2 x 25 KV, AC 50HZ OHE installations system and electrification of TSS, SSP, SP building, and TRD office etc. in Satna-Panna-Khajuraho new line section of Jabalpur division, West-Central Railway in connection with Lalitpur-Singrauli new rail line project.
|
Value :
INR 28.06 Cr
*
|
INR 280.68 Mn
*
|
Due Date :
25 Days to go
|
11/07/2024
|
TID :72900053
Madhya Pradesh
|
|
|
10. Sector : Crude Oil / Natural Gas / Mineral Fuels
Design, Engineering, Manufacturing, Supply, Inspection, Testing, Transportation, Fabrication and Site works, Erection, Commissioning and PGTR of back pressure turbine assembly package for STG 3 at Mathura Refinery on LSTK basis including mechanical, civil, electrcial and instrumentation works on Single Point Responsibility basis
|
Value :
18.89 Cr
*
|
188.95 Mn
*
|
Due Date :
11 Days to go
|
27/06/2024
|
TID :72248682
Uttar Pradesh
|
|
|