|
|
|
4. Sector : Water Storage and Supply
Construction of Intake Well with Gangway 257 M long, , RCC Riser for Rising Main, Supplying and laying Raw Water rising main, Clear Water rising main & Distribution Main, Elevated Service Reservoir 17 Nos., SUMP, Site Development, Approach Road, Supplying and Installation of VT & Centrifugal pump motor, Staff Quarter, House Connection and Five years operation & maintenance with allied works etc. all complete job for Remaining work of Multi Villages Scheme Gobindpur & Nirsa Block North Zone rural water Supply Scheme Under DW&S Div-No-1 on turnkey basis.” Under DMFT Head for the year 2023-24.
|
Value :
INR 411.33 Cr
*
|
INR 4.11 Bn
*
|
Due Date :
19 Days to go
|
17/10/2023
|
TID :64782156
Jharkhand
|
|
|
5. Sector : Health Services/Equipments
Design, Drawing, Construction, Testing, Commissioning of Floating Pontoon, Raw Water Electric substation (33/630 KVA), Raw water pumps (240 BHP, Discharge 631000 LPH, Head 65m 3 Nos.) and motors with manifold arrangement, Water Treatment Plant (28.5 MLD), Clear water Electric substation (33/0.415 KVA) clear water pump (6 Nos. of 250 BHP, Discharge 302794 LPH, Head 140m, each) and motors with manifold arrangement MBRs, Providing, laying, jointing and testing & commissioning of Raw water (600mm Dia., DI K-9 Length-3000m) & Clear water Pumping Main of DI K-9 pipe, (600mm Dia., Length-12230m) Clear Water Gravity main pipe from Z-MBR to 8 various MBR (DI K-7 900mm to 200mm dia., Total Length-129148m), Clear Water Gravity Main from MBR’s to various OHT’s (500mm-110mm dia. OPVC/DI K-7 pipe, Total Length 640236m) with all required valves & specials, to 245 villages OHT’s and all allied civil works including boundary wall around WTP campus, CC road inside WTP & on Floating Pontoon site to facilitate movement of goods and materials, providing and fixing Bulk flow meters, including integration of all component & Testing and trial run comprises of 3 months testing and 9 month of trial run.AITMA NAGAR MULTI VILLAGE SCHEME
|
Value :
INR 345.98 Cr
*
|
INR 3.45 Bn
*
|
Due Date :
5 Days to go
|
03/10/2023
|
TID :64688072
Chhattisgarh
|
|
|
|
7. Sector : Railways Transport Services
Engineering, procurement and Construction of New BC Rail line work, including Earthwork, Blanketing, Ballast Supply, Major/minor Bridges, RUB/LHS, Retaining wall, Station Buildings, water supply, Passenger amenities work, P.way work, supply of P. Way materials (except rails), Electrical General, Electrical TRD , Signal & Telecommunication work in connection with commissioning of the section.
|
Value :
INR 296.56 Cr
*
|
INR 2.96 Bn
*
|
Due Date :
20 Days to go
|
18/10/2023
|
TID :63757710
Multi State
|
|
|
8. Sector : Railways Transport Services
Earthwork in embankment and cutting including blanketing, Construction of Minor bridges, Major bridge, subways, side drains, station building, platform, toe walls P.Way Track linking, transportation of P.way material, supply & stacking of ballast, leading out of ballast, AT welding and other ancillary works between Agra Fort - Helak station in connection with doubling of AF-BKI section (KM 0.00 to 66.00).
|
Value :
INR 216.12 Cr
*
|
INR 2.16 Bn
*
|
Due Date :
7 Days to go
|
05/10/2023
|
TID :64224987
Multi State
|
|
|
9. Sector : Railways Transport Services
Earthwork in embankment and cutting including blanketing, Construction of Minor bridges, Major bridge, subways, side drains, station building, platform, toe walls P.Way Track linking, transportation of P.way material, supply & stacking of ballast, leading out of ballast, AT welding and other ancillary works between Agra Fort - Helak station in connection with doubling of AF-BKI section (KM 0.00 to 66.00).
|
Value :
INR 216.12 Cr
*
|
INR 2.16 Bn
*
|
Due Date :
7 Days to go
|
05/10/2023
|
TID :64224989
Multi State
|
|
|
|