2. Sector : Water Storage and Supply
Detailed survey, designing and drawing, construction of r.c.c. intake well cum pump house, r.c.c.gangway 252 m long and 3.50 m wide, 34.0 mld capacity conventional water treatment plant, 8 nos. rcc elevated service reservoir, staff quarter, compound wall, supplying and laying raw and clear water rising main and distribution network, house connection, supplying and installation of vt and centrifugal pump motor, five years operation & maintenance with allied works etc. all complete job for palajori block rural water supply scheme under d.w. & s. division madhupur on turnkey basis.”. (under jal jeevan mission).
|
Value :
INR 208.22 Cr
*
|
INR 2.08 Bn
*
|
Due Date :
8 Days to go
|
28/01/2021
|
TID :42374627
Jharkhand
|
|
|
3. Sector : Water Storage and Supply
Detailed survey, designing and drawing, construction of r.c.c. intake well cum pump house, r.c.c.gangway 252 m long and 3.50 m wide, 34.0 mld capacity conventional water treatment plant, 8 nos. rcc elevated service reservoir, staff quarter, compound wall, supplying and laying raw and clear water rising main and distribution network, house connection, supplying and installation of vt and centrifugal pump motor, five years operation & maintenance with allied works etc. all complete job for palajori block rural water supply scheme under d.w. & s. division madhupur on turnkey basis.
|
Value :
INR 208.22 Cr
*
|
INR 2.08 Bn
*
|
Due Date :
8 Days to go
|
28/01/2021
|
TID :42349668
Jharkhand
|
|
|
|
|
|
7. Sector : Water Storage and Supply
Detailed survey, designing and drawing, construction of r.c.c intake well cum pump house, r.c.c gangway 92 m long and 3.50 wide, 14.0 mld capacity conventional water treatment plant, 5 nos rcc elevated service reservoir, staff quarter compound wall, infiltration gallery, supply and laying raw and clear water rising main and distribution networks, house connection, supplying and installation of vt and centrifugal pump motor. five years operation & maintenance with allied works etc. all complete job for kashidih and adjoining villages scheme”
(part-b) detailed survey, designing and drawing, construction of r.c.c intake well cum pump house, r.c.c gangway 116 m long and 3.50 wide, 8.0 mld capacity conventional water treatment plant, 2 nos rcc elevated service reservoir, staff quarter compound wall, infiltration gallery, supply and laying raw and clear water rising main and distribution network, house connection, supplying and installation of vt and centrifugal pump motor. five years operation & maintenance with allied works etc. all complete job for karikado and adjoining villages scheme under devipur multi village rural water supply scheme under drinking water & sanitation division, deoghar on turnkey basis for the year 2020-21.
|
Value :
INR 143.40 Cr
*
|
INR 1.43 Bn
*
|
Due Date :
5 Days to go
|
25/01/2021
|
TID :42329174
Jharkhand
|
|
|
|
9. Sector : Canal/Irrigation Work
Package work on "turnkey basis" survey, investigation, design, supply, installation, testing etc., for lifting pumping secondary treated water of bangalore city. (1) 40 mld secondary treated water from kadubeesanahalli sewage treatment plant (stp) to bellanduru jackwell including improvements and beautification of narasapura tank, kolar amanikere tank in kolar taluk & someshwara palya tank in mulbagal taluk. (2) 50 mld secondary treated water to anekal lis project by combining 35 mld secondary treated water from agara stp and additional available 15 mld secondary treated water. (3) 15 mld secondary treated water from chikkabeguru sewage treatment plant (stp) to agara sewage treatment plant (stp). (4) 10 mld secondary treated water from hulimavu sewage treatment plant (stp) to chickabegur sewage treatment plant (stp). including filling of additional 8 tanks. under kc valley project including commissioning comprising of head works, construction of intake channels, jackwell cum pump houses, power supply including terminal bays, laying of transmission lines, raising mains, gravity mains, road crossings by trench less method and other components, including operation and maintenance for a period of five years after successful commission of package work on turnkey basis.
|
Value :
INR 110 Cr
*
|
INR 1.10 Bn
*
|
Due Date :
9 Days to go
|
29/01/2021
|
TID :41738187
Karnataka
|
|
|
10. Sector : Water Storage and Supply
Phase-1 constructing intake, 29 mld wtp, rcc u/g sump, rcc esr, pump room, operating unit, compound wall, providing, supplying, lowering, laying & jointing rising main pipeline & supply, installation, testing & commissioning of vt pumps with associated mechanical and electrical equipments, instruments & accessories with o&m of all type civil & mechanical structures, machineries & pipeline network for 5 yrs. under “rural wss covering 156 villages of deesa, lakhni taluka based on nmc.
|
Value :
INR 107.74 Cr
*
|
INR 1.07 Bn
*
|
Due Date :
23 Days to go
|
12/02/2021
|
TID :42423589
Gujarat
|
|
|