3. Sector : Power Plant
Route alignment, detailed survey. check survey, design (as applicable). engineering. manufacturing, assembly inspection, testing at manufacturer's works before dispatch, packing, supply including insurance, eens at site and subsequent storage, civil foundation work, erection, vesting and commissioning of 132 kv, two phase transmission line from nearest grid sub-station of aegcl to 6 nos. new railway traction sub-station, in connection with railway electrification work under pkg-6 & 7 of nfr.
|
Value :
INR 96.11 Cr
*
|
INR 961.10 Mn
*
|
Due Date :
5 Days to go
|
26/05/2022
|
TID :49380328
Uttar Pradesh
|
|
|
|
|
|
|
|
|
|