2. Sector : Water Storage and Supply
Design, build, trial run contract for const of intake well in tapi river near vankla villa. 140 mld wtp, mhw, rcc u/g sump, rcc esr, pump house & providing, supplying, lowering, laying & jointing pipelines &sitc of pumps with associated mech. and elec. equipment’s, instruments & accessories with operation & maintenance of 5 yrs. under regional water supply scheme for uncovered villag of of dist(100 villag) &jalalpor, gandevi and and tal of (171 vill.
|
Value :
INR 287.37 Cr
*
|
INR 2.87 Bn
*
|
Due Date :
17 Days to go
|
08/02/2021
|
TID :42312082
Gujarat
|
|
|
|
4. Sector : Water Storage and Supply
Phase-1 constructing intake, 29 mld wtp, rcc u/g sump, rcc esr, pump room, operating unit, compound wall, providing, supplying, lowering, laying & jointing rising main pipeline & supply, installation, testing & commissioning of vt pumps with associated mechanical and electrical equipments, instruments & accessories with o&m of all type civil & mechanical structures, machineries & pipeline network for 5 yrs. under “rural wss covering 156 villages of deesa, lakhni taluka based on nmc.
|
Value :
INR 107.74 Cr
*
|
INR 1.07 Bn
*
|
Due Date :
21 Days to go
|
12/02/2021
|
TID :42423589
Gujarat
|
|
|
5. Sector : Water Storage and Supply
Constructing 50 mld wtp, rcc u/g sump, rcc esr, pump room, operating unit, compound wall, providing, supplying, lowering, laying & jointing rising main pipeline & supply, installation, testing & commissioning of hscf pumps with associated mechanical and electrical equipments, instruments & accessories with operation & maintenance of all type civil & mechanical structures, machineries & pipeline network for 5 yrs. under rural water supply scheme covering 156 villages of deesa, lakhni.
|
Value :
INR 95.01 Cr
*
|
INR 950.11 Mn
*
|
Due Date :
21 Days to go
|
12/02/2021
|
TID :42422814
Gujarat
|
|
|
6. Sector : Water Storage and Supply
Detailed survey, designing and drawing, construction of 5.0 m. dia r.c.c. intake well cum pump house, gangway 50 mtr. length and 3.00 mtr. wide, infiltration gallery,01.0 mld capacity water treatment plant, 01 no. esr, 01 no. gsr, compound wall, supplying and laying raw/clear water rising main and laying distribution network, supplying and installation of vt and centrifugal pump motor, five years operation & maintenance with allied works etc. all complete job for garu rural pipe water supply scheme.
|
Value :
INR 91.82 Cr
*
|
INR 918.28 Mn
*
|
Due Date :
16 Days to go
|
07/02/2021
|
TID :42301698
Jharkhand
|
|
|
7. Sector : Water Storage and Supply
Bid documents for “design, build, trial run contract for construction of 16.50 mld wtp @jalundra head works, rcc u/g sump, rcc esr, pump room and providing, supplying, lowering, laying and jointing di & pvc pipeline network (rising main, connecting main and distribution gravity main) and supply, installation, testing and commissioning of hscf pumps with associated mechanical and electrical equipment’s, instruments & accessories at headwork and sub headwork, various size r.c.c. sump, esr, pump house construction of compound wall electrification work etc including operation&maintenance of all type civil & mechanical structures, machineries & pipeline network (new & existing) for 5yrs. under augmentation of (g-2) taluka including 1 urban water supply scheme (for technical problem villages) district.
|
Value :
INR 87.28 Cr
*
|
INR 872.89 Mn
*
|
Due Date :
18 Days to go
|
09/02/2021
|
TID :42318970
Gujarat
|
|
|
8. Sector : Water Storage and Supply
Design, build, trial run contract with 16.50 mld plant, RCC underground sump, RCC ESR, pump room & providing, supply, lowering, laying of DI & PVC pipeline network connection (rising main, connecting main & distribution gravity main) supply, installation, testing & commissioning of HSCF pump & associated mechanical & electrical equipments, headworks & sub headworks equipments & accessories, different sizes RCC sump, ESR, pump house, compound wall construction with electrification work, all types of civil & mechanical structure, machines & pipeline network (new & existing) for 05 years repair & maintenance. Gujarati
|
Value :
INR 87.28 Cr
*
|
INR 872.89 Mn
*
|
Due Date :
18 Days to go
|
09/02/2021
|
TID :42313918
Gujarat
|
|
|
9. Sector : Water Storage and Supply
Constructing rcc u/g sump, rcc esr, & providing, supplying, lowering, laying & jointing rising main pipeline & supply, installation, testing & commissioning of hscf pumps with associated mechanical and electrical equipments, instruments & accessories with operation & maintenance of all type civil & mechanical structures, machineries & pipeline network for 5 yrs. rural water supply scheme covering 156 villages of deesa, lakhni taluka based on nmc taping at devpura phase-4.
|
Value :
INR 85.35 Cr
*
|
INR 853.58 Mn
*
|
Due Date :
21 Days to go
|
12/02/2021
|
TID :42423717
Gujarat
|
|
|
|