|
|
|
|
5. Sector : Power Plant
Routine, Breakdown and annual overhauling Maintenance works of I&C systems such as Steam generator package, Closed loop control systems, Open loop control systems, Turbo-generator package, BFP drive turbines, CWPH, MRHS, FOPH, Compressors, COLT system, Out Laying Areas like Ash handling plant, RODM Plant, Condensate Polishing unit, Ozonization Plant, Water augmentation etc., for a period of two years.
|
Value :
INR 3.93 Cr
*
|
INR 39.35 Mn
*
|
Due Date :
26 Days to go
|
19/10/2023
|
TID :64596535
Karnataka
|
|
|
|
|
|
|
|