1. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Palwal Division (Package-2 consisting S/U Palwal S/Divn) under Palwal Circle which inter-alia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Re-conductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs . Implementation of Loss Reduction Works (under RDS Scheme) in Palwal Division (Package-2 consisting of S/U Palwal S/Divn) under Palwal Circle
|
Value :
24.71 Cr
*
|
247.14 Mn
*
|
Due Date :
24 Days to go
|
22/04/2024
|
TID :68766939
Haryana
|
|
|
|
|
4. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Hodal Division (Package-2 consisting Hassanpur S/Divn) under Palwal Circle which inter-alia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Re-conductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs . Implementation of Loss Reduction Works (under RDS Scheme) in Hodal Division (Package-2 consisting of Hassanpur S/Divn) under Palwal Circle
|
Value :
13.83 Cr
*
|
138.30 Mn
*
|
Due Date :
24 Days to go
|
22/04/2024
|
TID :68766911
Haryana
|
|
|
5. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Nuh Division (Package-2 consisting Firozpur Jhirka and Punhana S/Divns) under Palwal Circle which interalia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Re-conductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs. Implementation of Loss Reduction Works (under RDS Scheme) in Nuh Division (Package-2 consisting of Firozpur Jhirka S/Divn) under Palwal Circle
|
Value :
12.47 Cr
*
|
124.76 Mn
*
|
Due Date :
24 Days to go
|
22/04/2024
|
TID :68766914
Haryana
|
|
|
6. Sector : Power Plant
Site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the LRP works in the Nuh Division (Package-1 consisting Nuh and Nagina S/Divns) under Palwal Circle which inter-alia include Replacement of LT Bare Conductor with LT Armoured XLPE Cable of various sizes, Reconductoring of existing worn out LT Line with new ACSR Conductor of various sizes in Urban Area, Augmentation of existing 11 KV Line with new ACSR Conductor / XLPE Cable of various sizes, Bifurcation of existing 11 KV Feeders and Installation of VCBs . Implementation of Loss Reduction Works (under RDS Scheme) in Nuh Division (Package-1 consisting of Nuh and Nagina S/Divns) under Circle
|
Value :
10.82 Cr
*
|
108.21 Mn
*
|
Due Date :
24 Days to go
|
22/04/2024
|
TID :68766928
Haryana
|
|
|
|
|
|
|