Requirement :
|
Construction Of Section Office Building In Husnabad (v) Husnabad Division In Circle. Construction Of Control Room, Store Room & Toilet Room At 33/11kv Substation At Thotapally(V), Husnabad Division In Circle. Construction Of Control Room, Store Room & Toilet Room At 33/11kv Substation At Koheda (v), Husnabad Division In Siddipet Circle. Construction Of Fuse Off Call Office Building In Husnabad (v) Husnabad Division In Siddipet Circle. Construction Of Section Office Building At Koheda (v) And (m) Husnabad Division In Siddipet Circle. Construction Of Control Room, Store Room & Toilet Room At 33/11kv Substation At Bejjanki (v), Husnabad Division In Circle. Shifting Of 33kv,11kv,Lt Line Poles & Dtrs Coming Across 4-Line Road Widening From Mutrajpally (v) To Gajwel Town In Gajwel Mdl Of Toopran Divsion In Circle. Erection Of New 33/11kv Sub-Station With Connected 33kv And 11kv Lines At Jeerlapally (v) In Jharasangam(M) In Zaheerabad Division Of Medak Circle. Additional Estimate Fro Providing Of Bay Erection Of 132/33kv Bollaram To Separate The 33kv Itc Dedicated Feeder To Anrich Bollaram Ss -iii Feeder In Bollaram Section In Jinnaram(M) In Sangareddy Division In Medak Circle. Erection Of New 33/11kv Sub-Station With Connected 33kv And 11kv Lines At Pasthapur (v) In Zaheerabad In Zaheerabad Division Of Circle Under Ipds Works. Erection Of Bay Extension & 0.7km 11kv 3x185+1x70sq.Mm Ab Cable To Bifurcate The Existing 11kv Tychie Diecast Feeder To Avoid Overloading Wghich Is Emanating From 33/11kv Epip-Iii Ss In Isnapur Section In Sangareddy Divsion Medak Circle. Erection Of New 33/11kv Sub-Station With Connected 33kv And 11kv Lines At Paithara (v) In Kulcharam(M) Of Medak Division Of Circle. Shifting Of 4no's Dtr's 1no.250kva Dtr 1737022038 & 3no's100kvadtr(1737022384,1737022339&1737022049) From One Location To Another Location At J.P.Colony & Near Rukhmini Talkies In Patancheru Division Of Circle. Bay Extension And Erectionof 0.37km 11kv 3x185+1x70 Sqmm Ab Cable To Bifurcate The Existing 11kv U-Foam Feeder To Avoid Overloading Which Is Emanating From 33/11kv Epip-Iii Ss In Isnapur Section Of Sangareddy Division In Circle. Erection Of Addl. 2no's M-Type Towers From 132kv Zaheerabad Ss To Zaheerabad Check Post For Bi-Furcation Of 33kv Hadnoor Feeder For Providing 9hrs Day Time Agl In Nyalkal Section In Zaheerabad Division Of Circle. Bay Extension And Erectionof 0.7km 11kv 3x185+1x70 Sqmm Ab Cable To Bifurcate The Existing 11kv Thychie Diecast Feeder To Avoid Overloading Which Is Emanating From 33/11kv Epip-Iii Ss In Isnapur Section Of Sangareddy Division In Circle. Bay Extension And Erectionof 0.06km 11kv Line To Bifurcate The Existing 11kv Nandigama Feeder To Avoid Overloading Which Is Emanating From 33/11kv Nandigama Ss In Isnapur Section Of Sangareddy Division In Circle.
|