Requirement :
|
Supply And Installation Of Filtration Plant And Equipment, RMC Plant of 30 cum/hr., Transit Mixer, Tower Crane, Hoist Crane, Cage Lift (For Inspection, purpose), Plate vibrator, Pin vibrator 40 m.m.,, 60m.m Diesel/Electric, JCB, Loader, Tractor Troly, Electric / Petrol or diesel, steel saw, DG Set, Auto level, Total Station point survey, instrument, Diamond core cutter ~ Including Operation And Maintenance At The International Standard Swimming Pool Complex With Ancilliary Development Works ~ At Scheme No. 94 Sector F Ring Road
|