Requirement :
|
Work for general site facilities earth work of road embankment, construction of new road pavement(5.50m), strengthening and widening of existing pavement(2x1.15+3.20m) , surfacing by dbs wearing course (5.50m), construction of 1no p.c girder bridge, construction of 12nos rcc box culvert, rcc saucer drain, rcc "u" drain, cc block with geo textile, toe wall, sign, signal, k.m post, road marking, installation of directional sign of teknaf - shahparirdwip zila road ~ (z-1099) under cox's bazar road division during the year 2018-2019.
|