Requirement :
|
Measures in the west wing (phases 1a and 1b), roofing of hipped roof and dormers with roofing membrane, battens and roof tiles in crowning, visual formwork in the area of ??the roof overhangs, double standing seam cover made of titan zinc sheet of the round arched awning, the tonneau roof dormer and the round dormer as well as the flat roof area over the bay eg (courtyard side) and the canopies via entrances in the ground floor, roof exit window in the pitched roof surface of the hipped roof, roofing with thermal insulation, cast stone on pedestals, roof plumbing work, such as gutters, downpipes, snow guards, catwalks, roof hooks, gesimsbandverblechungen, window sills and other verblechungen, skylight with motor drive ~ .
|