Requirement :
|
Earth work, widening, strengthening, surfacing (5.50m), rigid pavement, surface/saucer drain, toe/gide wall, palasiding, sign signal, km post, road marking from ch8+500 km ~ to 17+500 km of nandigram-kaliganj-raninagar road, under road division,bogura during the year 2018-2019. (package no pw-02).
|