Requirement :
|
Earth work, widening, strengthening, surfacing (5.50m), culvert, rigid pavement, surface/saucer drain toe/gide wall, palasiding, sign signal, km post, road marking from ch0+000 km to 8+500 km of nandigram-kaliganj-raninagar road, ~ under road division, bogura during the year 2018-2019. (package no pw-1).
|