Requirement :
|
Earth work, widening, strengthening, surfacing (5.50m), culvert, surface/saucer drain, toe/gide wall, palasiding, sign signal, km post, road marking ~ from ch0+000 km to 12+000 km of nandigram-talora-dupchachia-akkelpur road, under road division, bogura during the year 2018-2019, (package no pw-3.).
|