Requirement :
|
Supply of necessary measures for fugitive ash suppression in lagoon two of ash pond of 2 660mw stage ii sstpp mppgcl dongalia distt urgent deployment of 2 nos. of 7.5 hp mono block diesel pumps ~ having suitable head as per site conditions each with 1200m flexible 65mm dia. pvc pipe with all accessories and labour, fuel charge for pumping accumulated water in the eastward & southward direction of the lagoon-ii of ash dyke phase-ii and spreading of pumped water over the dry ash ash to avoid spreading of ash in the air including shifting of pipes here and there as per direction of engineer in charge at least for 8 hr in 24 hour cycle, all handling transportation jointing of pipe etc. complete as per direction of engineer in charge.
deployment of unskilled labours for various works to be executed inside the bund to prevent mixing of ash in the blowing air such as cutting of channels, helping the firefighting vehicle pipes for sprinkling of water, plantation of beshram /tamesar trees, covering of ash with tarpaulin, and shifting here and there as per site condition, sprinkling water over the ash surface by flexible pipes extended from the ash pipe lines, spreading of moorum over the dry surface of ash or any other works as directed, in required strength i/c cost of labour t&p, insurance etc complete as per direction of engineer in-charge in any shift/shifts.
|