Requirement :
|
Contract for preliminary and detailed engineering design of four priority roads, Consultancy services for preliminary and detailed engineering design of 82km stretch of the existing Beledweyne-Galkayo road Dhusamareb-Qaradhi (60km) and BeledWeyne, Kalabeyr (22km), Maximum duration of the assignment is 6.25 months, Consultancy services for preliminary and detailed engineering design of 85km stretch of the existing Garowe-Galkayo road Galkayo-Faratoyo, Maximum duration of the assignment is 6.25 months, Consultancy services for preliminary and detailed engineering design of 100km stretch of Galkayo-Hobyo feeder road Galkayo-Elgula, Maximum duration of the assignment is 6.75 months, Consultancy services for preliminary and detailed engineering design of 80km Luuq- Dolow earth road, Maximum duration of the assignment is 6 months.
|