Requirement :
|
Procurement of pore pressure monitoring nvo, Establishment of approx 50 electrical pore pressure meters, instrumentation of approx. 30-40 existing drill holes energy wells, 30 environment logs assembled in river systems and streams (option), water level measurements in approx. 4 tarns lakes, climate logs for registering precipitation and temperature, establishment and transfer of measurement data to a web system with an access system, maintenance of each measuring point and the web system for the entire contract period, restoring meters (option), procurement of equipment after the contract period has expired (option).
|