Requirement :
|
Supply of 100NB & 150NB pipe-in-pipe (PIP) for dry fly ash handling system of Unit 1 to 4, CTPP, Chhabra Supply of Laboratory equipments at chemical laboratory, CTPP, “Supply of cooling water treatment chemicals along with services of CW chemical treatment for 4x250 MW CTPP (O&M), Chhabra Supply of Stationary items for the year 2019-20 to CTPP Supply of P-way railway track material, special devices & spares for railway marshalling yard at CTPP, Chhabra Supply of local gauges (like Pr./Diff. Pr.) installed at all major equipments at different locations in unit 1 to 4, CTPP, Chhabra “Supply of spare parts for M/s BEML make BD-155 Bulldozers & BE-220 Excavators of CHP, CTPP, Chhabra Supply of Linear actuator with motor for flap gates of conveyor system of CHP, Phase-I&II, Stage-I CTPP, Chhabra for the year 2019-20 Annual contract for providing day to day
Assistance in maintaining and running of various offices at CTPP, Chhabra The contract for testing and painting of 480 No. hydrogen gas cylinders and replacement of the defective valves of H2 cylinders with new valves of unit 1 to 4, Phase-I&II, Stage-I, CTPP, Chhabra Annual contract for
the work of complete operation, maintenance and housekeeping of coal handling plant at CTPP,
Chhabra, including wagon unloading, operation & maintenance of heavy machineries and other equipments, Railway line & equipments, Electrical & C&I works, of CHP area and other related works as specified in the scope of work for 4x250 MW Units, CTPP, Chhabra and wagons unloading for coal requirement of 2x660MW unit CSTPP, Chhabra Annual Maintenance Contract for PLC system of C&I, Stage-I, CTPP, Chhabra Annual contract for routine & capital maintenance of power transformers, service transformers, reactors and isolated phase bus duct of Unit 1 to 4 (4x250MW), Stage-I, Phase-I&II, CTPP, Chhabra (RVU1920WSOB00691)” by The Superintending Engineer (MM), (Civil), (Elect.), (CHP) & (C&I) respectively, Raja Annual contract for the work of complete operation, maintenance and housekeeping of coal handling plant. Supply of Granular activated carbon filter media or DM Plant Phase-I&II to CTPP, Chhabra Supply of filtering media (pebbles) for side stream filter (SSF) at cooling water treatment plant, fore-bay-I, Phase-I, CTPP, Chhabra. Supply of spares for package AC Units installed in CHP, CTPP, Chhabra Supply of geared motor for dribble conveyor in CHP, Phase-I, Stage-I, CTPP, Chhabra
|