Requirement :
|
Formation of 30m wide road (road no 2 & 8), 24m wide roads (road no 5 & 9 ), 18m wide roads (road no 1, 3. 4 & 14) including asphalting, construction of rcc side drains, rcc cross drainage works. rcc retaining wall & hdpe dual water supply pipe line for formation of mulawada industrial area layout in basavanabagewadi taluk. vjayapura dtstnct-package-1. * formation of 30m wide road (road no 2.10 & 15), 18m wide roads (road no 6. 7, 11, 12 & 13) including asphalting, construction of rcc side drains. rcc cross drainage works. glsr. rcc retaining wall, rwh. rising main, bore well & hdpe dual water supply pipe line for formation of mulawada industnal area layout in basavanabagewadi taluk. vjayapura distnct-package-2. * formation of 30m wide road (road no 2), 24m wide roads (road no 1 & 3), 18m wide roads (road no 4.5.6 ,7,8,10,11&12) 12m wide roads (road no 9) including asphalting, construction of rcc side drains. rcc cross drainage works. rcc storm water drain, rcc retaining wall & hdpe dual water supply pipe line for formation of kangala industnal area layout in hukkeri taluk. belagavi district-package-1. * Formation of 30m wide road (road no 2), 24m wide roads (road no 24), 18m wide roads (road no. 13,14,15.16.17. 18. 19. 20. 21. 22. 23. 25 & 26) including asphalting, construction of rcc side drains. rcc cross drainage works. rcc storm water drain. glsr. chain link fencing, rwh, rising mam, bore well & hdpe dual water supply pipe line for formation of kangala industrial area layout in hukkeri taluk, belagavi district-package-2.
|