Requirement :
|
Supply of rubber items for all circles, unit 1 to 4, ctpp, supply of m.s. items, plate/angle/channels for the year 2019-20 to ctpp, supply of spares for wagon tippler & apron feeder installed in phase-ii stage-i, chp, ctpp, supply of gear coupling in chp, phase-i&ii, stage-i to ctpp, supply of filters for equipments of chp, ctpp, supply spreading of ballast in marshalling yard including misc. civil works at ctpp. civil maintenance works in esp and bottom ash hopper area unit 1 to 4, ctpp, providing paving work and chainlink fencing at site store of ahp compressor house unit 1&2 at ctpp, annual contract for repair/reconditioning of bhel & other make valves in boiler & turbine area of unit 1 to 4 ctpp, annual contract for supply and application of insulation, spray insulation and application of refractory in boiler and turbine area of unit 1 to 4 (4x250mw) ctpp, annual contract for capital, breakdown and routine maintenance of boiler and its auxiliaries of unit 1 to 4, (4x250mw) ctpp, annual contract of hydrojet cleaning of boiler furnace & aph baskets during annual overhauling of unit 1 to 4 ctpp, annual contract for routine/breakdown capital maintenance of fire hydrant, hvw & mvw spray system, diesel/electrical pumps, compressors etc., and routine checking, cleaning & minor maintenance works of 4x250 mw chhabra thermal power project, chhabra, annual contract for lifting and transportation of dry fly ash from 500mt rcc main silos and bottom ash from im silo of unit 1 to 4 and transportation of the same to ctpp ash dyke or designated place & spreading of bottom ash in ash dyke at ctpp,
|