Requirement :
|
Supply of consumable item at project - binding wire, nut bolt all size, electrode 4mm (manglam/manohar), hasion cloths, foam packing smm, cutting disc 14", cutting disc 4", welding lead 600 amp. copper 25 sqmm, welding lead 600 amp. copper 16 sqmm, curing pipe pvc 1", plastic tarpolene 24×16, plastic tarpolene 24×18, gas cutter (kakkar), oxygen regulator, lpg regulator, welding holder, gas hose pipe, gas cutting nozle 3/64, welding goggles, rubber / leather hand gloves, safety helmet, phawda, gatihi, at construction of balance work of 4-laning of haridwar-dehradun section from km. 211.000 to km. 218.200 of nh-58 and km. 165.000 to km. 196.825 of nh-72 in the state of uttarakhand under nhdp phase-iii - package-1 from haridwar design ch. 209+100 to design ch. 216+824 of nh-58 and from design ch. 188+324 to laltappar design ch. 181+100 of nh – 72.
|