Requirement :
|
Survey, investigation, design, supply, installation testing and commissioning of lift system (head works consisting of construction of intake canal, jack well cum pump house, power supply including terminal bays, substation, 33 kv transmission lines) rising main with pressure distribution system, construction of gravity distribution system in pavagada taluk (filling of tanks 38 nos) and challakere taluk (filling of tanks 21 nos) under upper bhadra project including operation and main.
|