Requirement :
|
Proposed two (2) storey hospital ward building (hinatuan, surigao del sur). Excavation works, backfill, embankment from borrow, gravel fill, structural concrete, reinforcing steel, formworks and scaffolding, chb non load bearing (including reinforcing steel), 100mm, cold water line, sewer line works, water closet / urinal complete accessories, lavatory, wall hung complete, floor drain plates, toilet tissue holder, ceiling works, aluminum glass window, doors, glazed tiles, unglazed tiles, cement plaster finish, prepainted metal sheets, painting works (masonry/concrete), painting works (wood), roof framing, railings, conduits, boxes and fittings, wires and wiring devices, lighting fixtures, power load center, switchger and panel board, fire protection sprinkler system (automatic fire sprinkler system). fire alarm, project billboard, and mobilization demobilization.
|