Construction of turnkey contract for gruben primary school (1), the mid-section of the building shall contain a common room ("gruben") that goes over all floors. technical ventilation rooms are located on the roof. air conditioning systems are to be conveyed down in vertical shafts and distributed via main channels in the corridors. at Norway
Classified in :
#Air Conditioner
#Building
#Roof Work
#Ventilation
Key Values
Worth | : | kr 170000000.0 |
EMD | : | Refer Document |
Doc Fees | : | Refer Document |
Key Date
Due on | : | 19-Dec-2019 |
Days to go | : | -2021 Days |
Opening on | : | Refer Document |
Published on | : | 04-Dec-2019 |
Key Location
Location | : | Norway |
Address | : |
![]() |