Requirement :
|
Supply, installation, testing and commissioning (sitc) and comprehensive annual maintenance contract of ups for equipment - 10 kva online upsin parallel load sharing configuration., "battery bank with rack for backup up to 30 minutes or more on full load., (along with warranty for 2 years)", 10 kva online upsin main/stand by configuration. , battery bank with rack, for backup up to 30 minutes or more on full load. (along with warranty for 2 years), 5 kva online upsin parallel load sharingconfiguration. , battery bank with rack, for backup up to 30 minutes or more on full load. (along with warranty for 2 years), class c surge protector at the output of 10 kva ups, class c surge protector at the output of 5 kva ups, installation testing & commissioning, status of ups at equipment room via ethernet connection, pc based software for monitoring of ups, maintenance training, warranty of all ups for 3 years, camc of all ups for 3 years after warranty room, automation and nav-aids.
|