Requirement :
|
Designing, providing, supplying, installation,construction,fabrication,piping and connectivity with existing system, fittings, valves and pumps of tube settler including media necessary fixing materials channels / angles satisfactory testing and successful commissioning for 10mld capacity with 500 cum/hr discharge for lwss giri at balyog, etc complete.
|